EVD-SUS-004Evidence definitionSustainability and Software ArchitectureAsynchronous / scheduled workload efficiency assessmentReusableReference content

Asynchronous Workload Efficiency Assessment

Demonstrate that software and architecture choices smooth demand and improve utilization for work that does not require immediate processing.

Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.

Why it matters

The risk this evidence addresses

Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.

RiskWAG interpretation

Workloads consume avoidable resources because synchronous or poorly scheduled processing creates idle capacity and load spikes.

Synthesised from current AWS SUS03-BP01 guidance.

Control objectiveWAG guidance

Use asynchronous, scheduled and queue-driven software patterns where appropriate to smooth demand, improve utilization and reduce resources per unit of work.

Assessment of synchronous, asynchronous and scheduled workload paths, including queueing, batching, concurrency, idle capacity and utilization, used to reduce resources required per unit of work.

Ownership

Ownership and review

No accountable role is recorded for this record yet. These are the roles involved in producing and using it.

Produces and contributes

Gathers the evidence and completes the record.

Consumes and reviews

Relies on this record to judge whether the relevant control is operating.

Challenge

What to ask your team

Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.

  1. Q01

    Which work truly requires an immediate response?

  2. Q02

    Could queueing or batching smooth this demand?

  3. Q03

    What resource-per-unit improvement did the change produce?

  4. Q04

    What failure mode does asynchronous processing introduce?

Specification

What it must contain, and what makes it credible

Minimum expected content

  • Workload/job scope
  • Synchronous versus asynchronous requirement
  • Arrival pattern
  • Queue/buffer design
  • Batching opportunity
  • Worker concurrency
  • Utilization before/after
  • Resource per unit of work
  • Failure/retry behavior
  • Selected pattern and rationale

What good looks like

  • Non-interactive work is explicitly identified
  • Queueing and batching are considered
  • Utilization and resource-per-unit outcomes are measured
  • Failure/retry behavior is safe
  • Selected patterns reduce idle capacity

Warning signs

  • Everything processed synchronously
  • Scheduled jobs create avoidable peaks
  • Workers sit idle waiting for input
  • Batching introduced without failure/retry design
  • No measurement of utilization improvement

Measurement metadata expected

  • Resource per unit of work
  • Average worker utilization
  • Peak-to-average demand ratio
  • Queue age / processing latency
  • Idle capacity removed

Relationships

Where this evidence is used

Role journeys that reference it

  • Not yet placed in an authored role journey. The roles that own, produce and use it are listed above.

Review cadenceReview when workload demand, processing patterns, batch schedules or architecture change materially.