EVD-SEC-007Evidence definitionSecurity Engineering and AutomationSecurity baseline / infrastructure as codeReusableReference content

Standard Security Control Baseline / IaC Template

Demonstrate that standard security controls can be deployed repeatably and verified automatically rather than relying on workload teams or a central security team to reimplement controls manually for each deployment.

Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.

Why it matters

The risk this evidence addresses

Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.

RiskWAG interpretation

Security controls are implemented manually and inconsistently across workloads, causing configuration drift, slow remediation, incomplete coverage and dependence on specialist intervention for routine secure deployment.

Derived from current AWS SEC01-BP06 guidance on version-controlled security-control templates, automated deployment, tests, guardrails and self-service approved configurations.

Control objectiveWAG guidance

Define standard security controls as version-controlled reusable templates/policies, validate them automatically in delivery pipelines, deploy them consistently through approved automation and make secure defaults easy for workload teams to consume.

Version-controlled, reusable security-control definitions and infrastructure-as-code templates that deploy approved baseline controls consistently across workloads, accounts or environments, with automated tests and guardrails.

Ownership

Ownership and review

No accountable role is recorded for this record yet. These are the roles involved in producing and using it.

Produces and contributes

Gathers the evidence and completes the record.

  • Security Engineer
  • DevSecOps Engineer
  • Cloud Platform Engineer
  • Security Architect

Consumes and reviews

Relies on this record to judge whether the relevant control is operating.

The legacy automation source emphasised DevSecOps and Cloud Security Architecture. Current AWS shifts the focus from testing alone to automated deployment of standard controls; WAG therefore includes security engineering plus platform/DevOps production roles.

Security architecture/engineering should govern baseline intent; platform/DevOps teams maintain deployment automation and tests. Workload owners remain responsible for applicable configuration and exceptions.

Challenge

What to ask your team

Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.

  1. Q01

    Which standard security controls still require manual per-workload implementation?

  2. Q02

    Can workload teams consume the approved baseline without opening a security-team request?

  3. Q03

    What automated tests prevent an insecure baseline change from being released?

  4. Q04

    How is post-deployment drift detected and reconciled?

  5. Q05

    How quickly can a critical baseline security fix propagate to consuming workloads?

  6. Q06

    Which workloads are on unsupported/deprecated baseline versions?

Specification

What it must contain, and what makes it credible

Minimum expected content

  • Baseline/control package identity, version and owner
  • Security control objectives implemented by the baseline
  • Infrastructure-as-code, policy-as-code or configuration definitions
  • Intended deployment scope/accounts/environments/workload classes
  • Required inputs and permitted configuration variation
  • Automated unit/static/policy/security tests
  • Deployment pipeline and approval/change controls
  • Guardrails preventing or detecting unsafe configuration
  • Self-service consumption path for workload teams where applicable
  • Drift/conformance monitoring after deployment
  • Rollback/recovery and backup/version-retention approach
  • Supported/deprecated versions and migration expectations
  • Change history and review date

What good looks like

  • Baseline definitions are version controlled and reviewed like production code
  • Tests fail insecure or non-compliant changes before deployment
  • Secure defaults require less effort than bypassing them
  • Workload teams can consume approved controls without bespoke security-team tickets for routine cases
  • Post-deployment drift is detected
  • Baseline changes can be rolled back or recovered
  • Control objectives are traceable to the baseline and its validation evidence
  • Version/deprecation lifecycle is managed

Warning signs

  • A wiki page describes the baseline but teams implement it manually
  • A central security team deploys every control by request
  • Templates exist but have no automated security or policy tests
  • Workload teams fork templates and cannot consume upstream security fixes
  • Baseline success is measured by template deployment, not resulting control conformance
  • Emergency manual changes are never reconciled back into code
  • No supported-version or migration policy exists

Measurement metadata expected

  • Percentage of standard security controls available through approved automation
  • Percentage of consuming workloads/accounts on supported baseline versions
  • Median time to propagate a critical baseline security fix
  • Number of baseline policy/test failures detected before deployment
  • Number and age of security-control drift findings
  • Percentage of routine baseline deployments requiring manual security-team intervention

Checklist

Checklist and template structure

Use this record to describe the governed baseline and point to the actual version-controlled implementation. The evidence is strongest when the definitions, tests, deployment history and conformance results are linked.

  1. 01

    Baseline identity and scope

    Record owner, current version and intended consuming workloads/environments.

  2. 02

    Control objectives and definitions

    Map the baseline to security control objectives and implementation artefacts.

  3. 03

    Automated tests and guardrails

    Record static/policy/security tests and unsafe-configuration prevention.

  4. 04

    Automated deployment and consumption

    Describe pipeline, approvals and self-service path.

  5. 05

    Post-deployment conformance / drift

    Describe runtime/configuration conformance monitoring.

  6. 06

    Version lifecycle and recovery

    Record supported versions, migration, rollback and recovery expectations.

Adopt this artefact

Markdown

The blank file contains one section per heading shown above, with the guidance kept as a quote you can delete.

Review cadenceReview with every material baseline/template version and at a defined security-engineering cadence; retain version history and supported versions.