Workload Component Cost / TCO Analysis

Demonstrate that material workload components have been analyzed proportionately and that service-selection decisions consider total organizational cost rather than provider price alone.

Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.

Why it matters

The risk this evidence addresses

Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.

RiskWAG interpretation

Components are selected or retained without understanding total cost of ownership, operational effort or projected usage, leading to avoidable long-term cost and missed managed-service or architecture alternatives.

Synthesised from current AWS COST05-BP02, COST05-BP03, COST05-BP05 and COST05-BP06 guidance.

Control objectiveWAG guidance

Analyze every workload component at a level proportionate to its current/projected cost and optimization potential, considering total cost of ownership, operational effort, alternatives and usage changes over time.

A structured analysis of workload components covering current and projected cost, operational-management effort, licensing, service alternatives, total cost of ownership, usage scenarios and expected benefits.

Ownership

Ownership and review

No accountable role is recorded for this record yet. These are the roles involved in producing and using it.

Produces and contributes

Gathers the evidence and completes the record.

Consumes and reviews

Relies on this record to judge whether the relevant control is operating.

Challenge

What to ask your team

Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.

  1. Q01

    Which component has the highest lifetime optimization potential?

  2. Q02

    Where would more analysis cost more than it could reasonably save?

  3. Q03

    Which component looks expensive only because operational effort is excluded from the comparison?

  4. Q04

    At what future usage level does the preferred service option change?

  5. Q05

    Which assumption drives the recommendation most strongly?

Specification

What it must contain, and what makes it credible

Minimum expected content

  • Component/service scope
  • Current architecture/service option
  • Current cost baseline
  • Projected usage levels
  • Projected cost by scenario
  • Operational/management effort
  • Licensing/support costs
  • Migration/change effort where relevant
  • Alternative service/component options
  • TCO comparison
  • Business/architecture constraints
  • Expected benefit and payback
  • Analysis effort/materiality rationale
  • Recommendation and review trigger

What good looks like

  • All material components are covered
  • Analysis effort scales with potential benefit
  • TCO includes operational and management effort
  • Projected usage is considered rather than today's load only
  • Managed, self-managed and alternative architecture options are considered where relevant
  • Recommendations are linked to organization priorities
  • Assumptions and uncertainty are explicit

Warning signs

  • Only the top three line items are analyzed
  • Price-per-hour is treated as TCO
  • A day of analysis is spent to save negligible lifetime cost
  • Current usage is assumed to remain constant indefinitely
  • Managed services are rejected because unit price is higher without valuing operations effort
  • Potential savings are quoted without migration/change cost

Measurement metadata expected

  • Percentage of material workload cost covered by current component analysis
  • Percentage of major components with projected usage scenarios
  • Estimated optimization opportunity by component
  • Analysis effort compared with expected benefit
  • Age of analysis for high-cost components

Checklist

Checklist and template structure

Use this analysis at component level and scale effort to potential benefit. Keep the durable architecture decision in an ADR where a choice is made.

  1. 01

    Component scope and baseline

    Identify the component, current service/architecture and current cost/TCO baseline.

  2. 02

    Usage and cost scenarios

    Model current and projected usage levels and resulting cost.

  3. 03

    TCO and operational effort

    Include management, support, licensing and change/migration effort where material.

  4. 04

    Options and comparison

    Compare alternative services/components against workload priorities.

  5. 05

    Recommendation and review trigger

    Record recommendation, uncertainty, expected benefit and when to revisit.

Adopt this artefact

CSV

The blank file contains one column per template section, in the order shown above, plus a single empty row to start from.

Review cadenceReview high-cost/material components at least annually and when usage, pricing, architecture or service options change materially.