Workload Component Cost / TCO Analysis
Demonstrate that material workload components have been analyzed proportionately and that service-selection decisions consider total organizational cost rather than provider price alone.
Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.
Why it matters
The risk this evidence addresses
Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.
Components are selected or retained without understanding total cost of ownership, operational effort or projected usage, leading to avoidable long-term cost and missed managed-service or architecture alternatives.
Synthesised from current AWS COST05-BP02, COST05-BP03, COST05-BP05 and COST05-BP06 guidance.
Analyze every workload component at a level proportionate to its current/projected cost and optimization potential, considering total cost of ownership, operational effort, alternatives and usage changes over time.
A structured analysis of workload components covering current and projected cost, operational-management effort, licensing, service alternatives, total cost of ownership, usage scenarios and expected benefits.
Ownership
Ownership and review
No accountable role is recorded for this record yet. These are the roles involved in producing and using it.
Produces and contributes
Gathers the evidence and completes the record.
Consumes and reviews
Relies on this record to judge whether the relevant control is operating.
Challenge
What to ask your team
Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.
- Q01
Which component has the highest lifetime optimization potential?
- Q02
Where would more analysis cost more than it could reasonably save?
- Q03
Which component looks expensive only because operational effort is excluded from the comparison?
- Q04
At what future usage level does the preferred service option change?
- Q05
Which assumption drives the recommendation most strongly?
Specification
What it must contain, and what makes it credible
Minimum expected content
- Component/service scope
- Current architecture/service option
- Current cost baseline
- Projected usage levels
- Projected cost by scenario
- Operational/management effort
- Licensing/support costs
- Migration/change effort where relevant
- Alternative service/component options
- TCO comparison
- Business/architecture constraints
- Expected benefit and payback
- Analysis effort/materiality rationale
- Recommendation and review trigger
What good looks like
- All material components are covered
- Analysis effort scales with potential benefit
- TCO includes operational and management effort
- Projected usage is considered rather than today's load only
- Managed, self-managed and alternative architecture options are considered where relevant
- Recommendations are linked to organization priorities
- Assumptions and uncertainty are explicit
Warning signs
- Only the top three line items are analyzed
- Price-per-hour is treated as TCO
- A day of analysis is spent to save negligible lifetime cost
- Current usage is assumed to remain constant indefinitely
- Managed services are rejected because unit price is higher without valuing operations effort
- Potential savings are quoted without migration/change cost
Measurement metadata expected
- Percentage of material workload cost covered by current component analysis
- Percentage of major components with projected usage scenarios
- Estimated optimization opportunity by component
- Analysis effort compared with expected benefit
- Age of analysis for high-cost components
Checklist
Checklist and template structure
Use this analysis at component level and scale effort to potential benefit. Keep the durable architecture decision in an ADR where a choice is made.
- 01
Component scope and baseline
Identify the component, current service/architecture and current cost/TCO baseline.
- 02
Usage and cost scenarios
Model current and projected usage levels and resulting cost.
- 03
TCO and operational effort
Include management, support, licensing and change/migration effort where material.
- 04
Options and comparison
Compare alternative services/components against workload priorities.
- 05
Recommendation and review trigger
Record recommendation, uncertainty, expected benefit and when to revisit.
Adopt this artefact
CSVThe blank file contains one column per template section, in the order shown above, plus a single empty row to start from.
Relationships
Where this evidence is used
Practices that expect it
- COST05-BP02 — Analyze all components of this workload
- COST05-BP03 — Perform a thorough analysis of each component
- COST05-BP04 — Select software with cost-effective licensing
- COST05-BP05 — Select components of this workload to optimize cost in line with organization priorities
- COST05-BP06 — Perform cost analysis for different usage over time
- COST06-BP01 — Perform cost modeling
- COST06-BP02 — Select resource type, size, and number based on data
- COST06-BP04 — Consider using shared resources
- COST07-BP01 — Perform pricing model analysis
- COST07-BP03 — Select third-party agreements with cost-efficient terms
- COST07-BP04 — Implement pricing models for all components of this workload
- COST08-BP01 — Perform data transfer modeling
- COST09-BP01 — Perform an analysis on the workload demand
- COST10-BP01 — Develop a workload review process
Role journeys that reference it
- Not yet placed in an authored role journey. The roles that own, produce and use it are listed above.
Review cadenceReview high-cost/material components at least annually and when usage, pricing, architecture or service options change materially.