SEC01-BP07SecuritySEC18 of 8 practices publishedReference content

Identify threats and prioritize mitigations using a threat model

Framework question: How do you securely operate your workload?

Risk if not established
High
Framework verified
6 Sept 2026

AWS Well-Architected Framework — SEC01-BP07 Identify threats and prioritize mitigations using a threat model

Executive summary

Why this practice matters

Use a living threat model to understand what is being protected, what can go wrong, which mitigations are appropriate and whether those mitigations are good enough. Keep it current as the workload, threat landscape and security services change.

Business impact

  • Finds security risks earlier, when mitigation is usually cheaper and more flexible.
  • Focuses security controls on workload-specific threats rather than generic checklists alone.
  • Creates a structured basis for prioritising limited security investment.
  • Improves traceability between architecture, threats, mitigations and residual risk.

Assign

Accountable and responsible roles

Responsibilities are held separately from roles, so accountability type and typical roles are stated explicitly.

ResponsibilityAccountability type

Facilitate and maintain threat modelling

Guide the systematic identification, prioritisation and review of workload threats and mitigations.

Typical roles: Security Architect, Security Architect

responsible

Provide workload design and implementation context

Contribute architecture, data-flow, dependency and code-specific knowledge.

Typical roles: Software Engineer, Architect, Software Engineer, Architect

responsible

Own material mitigation and residual risk

Ensure high-priority threat treatment is visible in product/service risk decisions.

Typical roles: Service Owner, Service Owner

accountable

Assessment

Assessment and evidence state

States describe how far the practice has moved from intent to something continuously validated.

  1. 0

    Not Assessed

    Threat-modelling practice has not been assessed.

    Indicators

    • No current workload threat model is known.
  2. 1

    Not Implemented

    Security risks are handled informally without a systematic workload threat model.

    Indicators

    • Threats are generic or discovered late.
    • Mitigations are checklist driven.
  3. 2

    Partially Implemented

    Threat models exist for some workloads/features but coverage, prioritisation or maintenance is inconsistent.

    Indicators

    • Models become stale.
    • Threat findings are not always owned.
  4. 3

    Implemented

    Material workloads use current threat models that influence control design and risk treatment.

    Indicators

    • High-priority threats have mitigations.
    • Review triggers are defined.
  5. 4

    Continuously Validated

    Threat modelling is integrated into change and security processes, with quality and currency actively improved.

    Indicators

    • Material changes trigger review.
    • Threat/control evidence is linked and measurable.

Assessment dimensions

  • Model completeness

    Practice-specific

    Absent · Partial · Decision-useful

  • Threat prioritisation

    Practice-specific

    Unstructured · Qualitative · Consistent risk-based

  • Mitigation traceability

    Practice-specific

    Weak · Partial · Threat-to-control

  • Model currency

    Practice-specific

    Stale · Periodic · Change-triggered

Caution

Threat modelling is not a one-time security workshop or diagram. The useful evidence is a current model that changes security decisions, mitigation priorities and residual-risk treatment.

Standard

What you should be able to demonstrate

Statements a reviewer should be able to confirm from evidence, not from intent.

  • Threat modelling starts early enough to influence design decisions.
  • Scope, assets, actors, trust boundaries and important assumptions are clear.
  • Threats are prioritised by realistic impact/likelihood or another agreed method.
  • Mitigations have owners and link to concrete security control objectives.
  • The model is revisited after material workload or threat-landscape changes.

Trade-offs to hold in view

  • Threat models should be detailed enough to drive decisions without becoming exhaustive inventories that cannot be maintained.
  • Different modelling methods can work; consistency and decision usefulness matter more than one mandated notation.
  • Automation or threat-modelling tools can accelerate analysis but do not replace collaborative security reasoning.

Assess

Questions to ask

Each question exposes the difference between an intention and an operating practice.

  • discovery

    What are we protecting, who or what can interact with it, and where are the important trust boundaries?

    Establishes a shared security-relevant model of the workload.

    Usually asked by: Security Architect, Software Engineer

  • challenge

    Which plausible threat scenarios would cause the largest business or security impact?

    Prioritises threat analysis around meaningful outcomes.

    Usually asked by: Security Architect, Service Owner

  • evidence

    What mitigations are assigned to the highest-priority threats, and what evidence shows those mitigations are operating?

    Connects threat analysis to control implementation and assurance.

    Usually asked by: Security Engineer, Risk / Compliance / Governance

  • challenge

    What material architecture, feature or threat-landscape changes have occurred since the model was last reviewed?

    Tests whether the threat model remains a living artefact.

    Usually asked by: Security Architect, Service Owner

Evidence

Required and expected evidence

Reusable evidence definitions held once in the evidence library and referenced by every practice that relies on them. Each links to what good evidence looks like and to worked examples.

EVD-SEC-001coreReusable

Threat Model

A maintained workload-level model of relevant security threats, attack paths and trust boundaries, their likelihood and impact, and the preventive, detective and responsive mitigations used to reduce exposure.

Use the canonical Threat Model as the living record of workload scope, threats, mitigations, priorities and review triggers.

Minimum expected content

  • Workload/system scope and security-relevant business assets
  • Relevant architecture, data flows and trust boundaries
  • Threat actors, threat sources and material assumptions
  • Threat scenarios, attack paths or abuse cases
  • Likelihood/probability and potential business/security impact
  • Threat priority or risk ranking
  • Preventive, detective and responsive mitigations planned or in place
  • Residual exposure, gaps or accepted limitations
  • Owner/action status for material unresolved threats
  • Last reviewed date and explicit review/change triggers

Anti-patterns

  • A one-time architecture diagram labelled as a threat model with no explicit threat scenarios
  • A generic OWASP, STRIDE or MITRE list copied into the record without workload-specific analysis
  • The model is not updated after material architecture, data-flow or trust-boundary changes
  • Threats are listed but have no prioritisation, mitigation or owner
  • Tool findings are treated as the threat model rather than inputs to analysis
  • The model records only implemented controls and hides unresolved or residual exposure
  • Threat modelling is performed only immediately before assurance review rather than as part of design and change

Review: Review on an agreed security/risk cadence and after material architecture, data-flow, trust-boundary, threat-intelligence, vulnerability or incident changes that could alter the threat picture.

EVD-RISK-001supportingReusable

Risk Register

A current, owned register of material risks relevant to a workload, initiative or decision, showing how each risk is assessed, treated, monitored and escalated.

Use the Risk Register where material residual security risk requires owned treatment, tracking or acceptance.

Minimum expected content

  • Stable risk identifier and concise risk statement
  • Source, context or decision that gives rise to the risk
  • Affected workload, service, capability or business outcome
  • Likelihood and impact assessment using the organisation's agreed method
  • Risk owner responsible for ensuring the risk is actively managed
  • Planned treatment or mitigation actions, including action owners and target dates where applicable
  • Residual risk after current/planned treatment
  • Current status and trend or material change since the previous review
  • Next review date or review trigger
  • Decision or acceptance authority where residual risk requires explicit acceptance

Anti-patterns

  • A long list of generic risks with no connection to actual decisions, workloads or outcomes
  • Risk owner fields populated with teams or committees that cannot take action
  • Likelihood and impact scores copied forward without reviewing changed evidence
  • Mitigation actions with no owner, target or evidence of progress
  • Residual risk assumed to be accepted because a risk remains open
  • The register is updated for audits but is not used when material decisions are made

Review: Maintain continuously; review at material decisions, governance reviews, significant change and whenever assumptions, exposure or treatment status changes.

EVD-SEC-004supportingReusable

Security Control Objectives & Control Mapping

A mapping from security control objectives to the risks, compliance obligations, implemented controls, owners and validation evidence that demonstrate how each objective is achieved.

Use Security Control Objectives & Control Mapping to connect threat mitigations to implemented controls and effectiveness evidence.

Minimum expected content

  • Stable control-objective identifier and outcome statement
  • Source threat, risk, compliance or governance requirement
  • Applicable workload/system/data scope
  • Preventive, detective and responsive controls implementing the objective
  • Control owner and operating responsibility
  • Implementation mechanism or platform guardrail
  • Validation/test method and cadence
  • Current effectiveness or conformance status
  • Point-in-time and/or period evidence source
  • Known gaps, exceptions or compensating controls
  • Remediation owner/status where applicable
  • Last reviewed date and change/review trigger

Anti-patterns

  • A list of security products is treated as a set of control objectives
  • Controls are mapped to compliance citations but not to the security outcome they achieve
  • Configuration presence is treated as proof of effectiveness
  • Evidence is collected only immediately before audit
  • One control owner is assumed to validate their own control without appropriate review
  • Threat-model findings do not alter control objectives or priorities

Review: Review when threat models, compliance obligations, architecture or controls change, and at the cadence required to validate control effectiveness.

Diagnosis

Common evidence gaps

  • Threat model created too late

    Analysis occurs after implementation choices are difficult or costly to change.

  • Generic threat checklist

    Threats are not tied to the actual workload, trust boundaries or business assets.

  • No mitigation ownership

    Threats are identified but not connected to owned treatment.

  • Model becomes stale

    Architecture and threat-landscape changes do not trigger review.

Implementation

Implementation guidance

Model what you are protecting

Capture security-relevant scope, assets, actors, data flows, trust boundaries and assumptions.

Identify what can go wrong

Use a repeatable threat-identification method appropriate to the workload and include business/security impact.

Prioritise and assign mitigations

Focus control effort on material threats and connect mitigation actions to owners and security control objectives.

Keep it alive

Revisit the model after major changes, material threat-intelligence changes or adoption of new services/features.

Measure

Measurements

  • Percentage of material workloads/features with a current threat model.
  • Percentage of high-priority threats with named mitigation owners.
  • Number and age of high-priority threats without adequate mitigation.
  • Percentage of material architecture changes that triggered threat-model review.
  • Age since last substantive threat-model review for critical workloads.

Related

Outcomes and practices

Business outcomes

    Practices