Automated Resource Decommissioning Control Baseline
Demonstrate that appropriate non-critical or unused resources can be reduced or removed automatically without compromising workload safety or business continuity.
Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.
Why it matters
The risk this evidence addresses
Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.
Manual decommissioning is too slow or inconsistent to remove low-value capacity promptly, while poorly governed automation can terminate resources unsafely.
Synthesised from current AWS COST04-BP04 guidance.
Automate resource reduction or decommissioning where safe and economically justified, with explicit trigger conditions, exclusions, tests, safeguards, observability and rollback/disable controls.
A controlled definition of automated scale-in, expiry, teardown or decommissioning controls, including trigger conditions, exclusions, safeguards, test evidence and monitoring of automation outcomes.
Ownership
Ownership and review
No accountable role is recorded for this record yet. These are the roles involved in producing and using it.
Produces and contributes
Gathers the evidence and completes the record.
Consumes and reviews
Relies on this record to judge whether the relevant control is operating.
Challenge
What to ask your team
Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.
- Q01
What is the worst resource this automation could terminate incorrectly?
- Q02
How does the control distinguish temporary low usage from true redundancy?
- Q03
Who can disable the automation during an incident?
- Q04
What evidence proves the automation was tested under failure conditions?
- Q05
How much unused capacity does the automation currently remove automatically?
Specification
What it must contain, and what makes it credible
Minimum expected content
- Automation/control name
- Resource types and environments in scope
- Trigger metric/event/expiry condition
- Minimum observation or grace period
- Exclusions and protected resources
- Safety/health conditions
- Scale-in or deletion action
- Notification/escalation behavior
- Rollback/disable mechanism
- Non-production test evidence
- Production monitoring and audit trail
- Owner and review cadence
What good looks like
- Automation targets resources where termination is actually safe
- Triggers include a time/grace dimension where low usage can be normal
- Protected or critical resources are explicitly excluded
- Automation is tested before broad production use
- Failures and unexpected terminations are observable
- Control can be disabled or rolled back quickly
Warning signs
- Delete anything with zero CPU for five minutes
- Production and test resources share identical termination rules without justification
- Automation has no owner or audit trail
- Manual exceptions accumulate permanently
- Savings are measured but customer-impact risk is not
Measurement metadata expected
- Percentage of eligible resource classes covered by safe automation
- Value of capacity/resources automatically removed
- Automation false-positive/rollback rate
- Number of stale manual exceptions
- Percentage of automated controls tested on schedule
Checklist
Checklist and template structure
Use this baseline to document the controls that automatically scale in, expire or decommission resources and the safeguards that make that automation safe.
- 01
Scope and ownership
Define resource types, environments and accountable operating owner.
- 02
Triggers and actions
Define events/metrics/expiry rules, grace periods and resulting actions.
- 03
Safeguards and exclusions
Identify critical exclusions, health checks, notification and rollback controls.
- 04
Testing and validation
Record non-production testing and failure-condition validation.
- 05
Operation and monitoring
Track outcomes, errors, exceptions and periodic review.
Adopt this artefact
CSVThe blank file contains one column per template section, in the order shown above, plus a single empty row to start from.
Relationships
Where this evidence is used
Practices that expect it
Role journeys that reference it
- Not yet placed in an authored role journey. The roles that own, produce and use it are listed above.
Review cadenceReview quarterly and after material incidents, workload architecture changes or provider capability changes.