operations-managerOperations

Operations Manager accountability journey

Provides operational assurance input and ensures the people, processes, monitoring and support capabilities required to run the service are ready.

Also known as: Operations Manager

  1. Role
  2. Requirement
  3. Practice
  4. Evidence
  5. Example

Your accountabilities

What this role is accountable for

Showing 8 of 18 practices where this role is marked Accountable, across pillars. The rest are listed under "Also relevant".

Also relevant (47)

Accountabilities beyond the first 8, and practices where this role is responsible, consulted or named in a question.

Cost Optimization (15)

Operational Excellence (13)

Performance Efficiency (2)

Reliability (10)

Sustainability (7)

What you are being asked

Key concerns

  • Service operability
  • Monitoring and alerting
  • Incident response
  • Recovery readiness
  • Operational ownership

How the guide answers them

  1. 01

    Assess

    Ask for the current state of each practice against defined states, not a single maturity percentage.

  2. 02

    Assign

    Confirm one accountable role per activity and that the named owner agrees they own it.

  3. 03

    Evidence

    Ask what evidence exists, when it was last reviewed, and whether it would stand up unaided.

  4. 04

    Improve

    Fund a short list of actions by business risk and horizon rather than an open improvement backlog.

Evidence

Evidence you should expect to see

Records that name this role, plus those from its authored journey and the practices it is accountable for. Open any record for its specification, suggested format, blank template, a worked example and the questions to ask when it is presented to you.

  • EVD-ARCH-001Architecture / domain modelArchitecture and GovernanceReusable

    Service / Domain Boundary Model

    Demonstrate that workload boundaries have been chosen deliberately to support business cohesion, reliability, independent change and scaling without creating unnecessary distributed-system complexity.

    Must contain

    • Workload scope and major business capabilities or domains
    • Services/modules and the business/domain responsibility of each
    • Named owning team or accountable service ownership where known
    • Uses this record

    Ask: Why does each major service or module boundary exist?

    Expected owner:
    Solution Architect, Software Architect, Domain Architect, Technical Lead, Product / Service Owner, Business Analyst
    Review:
    Review after material domain, service, ownership, data, scaling or resilience changes, and periodically where the workload continues to evolve.
    Specification, template and example →
  • EVD-ARCH-003Dependency map / runtime analysisArchitecture and ReliabilityReusable

    Dependency / Coupling View

    Demonstrate that teams understand the dependencies that can constrain independent change, introduce latency or propagate failures across intended workload boundaries.

    Must contain

    • Major services/components in scope
    • Inbound and outbound dependencies
    • Interaction type such as synchronous, asynchronous, shared data or batch
    • Uses this record

    Ask: Which critical user journeys have the highest synchronous fan-out?

    Expected owner:
    Architect, Software Engineer, DevOps Engineer, Site Reliability Engineer, Operations
    Review:
    Keep aligned with material architecture changes and refresh from runtime/deployment evidence where practical.
    Specification, template and example →
  • EVD-ARCH-009Architecture option / trade off evaluationArchitecture and PerformanceReusable

    Architecture Option Evaluation

    Demonstrate that material architecture choices considered credible alternatives and relevant external/internal guidance rather than being selected through familiarity, assumption or vendor default.

    Must contain

    • Decision/evaluation scope and workload context
    • Business, customer and workload requirements relevant to the choice
    • Viable services, configurations or architecture patterns considered
    • Uses this record

    Ask: What credible option did we reject, and what evidence justified rejecting it?

    Review:
    Create or refresh for material architecture choices and revisit when requirements, provider capabilities, costs or operating evidence materially change.
    Specification, template and example →
  • EVD-COMP-002Record / matrixCompliance and AssuranceReusable

    Compliance Control / Evidence Mapping

    Demonstrate that compliance requirements have been translated into specific controls and evidence expectations that can be validated continuously or at the cadence required by the framework.

    Must contain

    • Compliance requirement identifier
    • Control objective or required outcome
    • Implemented workload control or mechanism
    • Uses this record

    Ask: Which control objective satisfies each applicable compliance requirement?

    Expected owner:
    Compliance Officer, Security Architect, Security Engineer, Operations Manager, Service Owner
    Review:
    Update when a compliance requirement, control objective, implementation, framework version or evidence source changes; review before audits and during material workload change.
    Specification, template and example →
  • EVD-COMP-003ReportCompliance and AssuranceReusable

    Compliance Validation / Audit Report

    Provide a reproducible assurance record showing that compliance was actually validated against the applicable framework and that gaps, evidence and conclusions are visible to reviewers rather than inferred from policy or control design alone.

    Must contain

    • Compliance framework/obligation and version or assessment basis
    • Workload/system scope and assessment period
    • Applicable requirements/control objectives assessed
    • Produces this record

    Ask: What exact framework/version and workload scope does this report cover?

    Expected owner:
    Compliance Officer, Operations Manager, Security Engineer, Assurance / Governance
    Review:
    Generate at the cadence required by the applicable compliance framework, audit programme or internal assurance process and after material events where revalidation is required.
    Specification, template and example →
  • EVD-COST-004Performance report / exception recordCost Optimization and OperationsReusable

    Cost Optimization Performance & Exception Report

    Demonstrate that cloud cost is reported and monitored proactively and that alerts, anomalies and negative trends lead to owned action rather than passive dashboard viewing.

    Must contain

    • Reporting period and scope
    • Budget/forecast versus actual
    • Top cost drivers and material changes
    • Produces this record

    Ask: Which unresolved anomaly has the largest financial impact?

    Review:
    Daily to monthly depending on scale and volatility; management reporting should follow the established CFM cadence.
    Specification, template and example →
  • EVD-COST-008Goals / KPI registerCost Optimization and Performance ManagementReusable

    Cost & Usage Goals / KPI Register

    Demonstrate that cloud financial management has explicit, measurable cost and usage outcomes rather than an undefined objective to reduce spend.

    Must contain

    • Goal statement
    • Metric/KPI definition
    • Baseline
    • Uses this record

    Ask: What outcome should improve for every dollar spent?

    Review:
    Monthly or quarterly depending on cost materiality and workload volatility.
    Specification, template and example →
  • EVD-COST-011Lifecycle registerCost Optimization and Resource LifecycleReusable

    Resource / Project Lifecycle Register

    Demonstrate that projects, environments and material resource groups have active owners, lifecycle state and review/decommission triggers so obsolete spend is identified and removed.

    Must contain

    • Project/workload/environment identifier
    • Business purpose
    • Owner
    • Produces this record

    Ask: Which environment has not been reviewed for the longest time?

    Review:
    Review monthly or quarterly depending on estate size and change rate.
    Specification, template and example →
  • EVD-COST-012Data / tooling baselineCost Optimization and Financial OperationsReusable

    Cost Management Data & Tooling Baseline

    Demonstrate that sufficiently detailed cost and usage data is available, retained, accessible and supported by configured billing/cost-management tooling for analysis, forecasting, alerting and optimization.

    Must contain

    • Cost and usage data sources
    • Data granularity and update frequency
    • Retention period and historical coverage
    • Uses this record

    Ask: Which cost decision can we not answer with current data?

    Review:
    Review quarterly and whenever billing architecture, account structure or major cost-management tooling changes.
    Specification, template and example →
  • EVD-COST-017Procedure / execution recordCost Optimization and Resource LifecycleReusable

    Resource Decommissioning Procedure & Execution Record

    Demonstrate that resource decommissioning is a repeatable, owned process and that identified resources are actually removed safely and completely.

    Must contain

    • Candidate resource/workload identifier and owner
    • Reason/trigger for decommissioning
    • Usage and dependency validation
    • Produces this record

    Ask: How do we prove the resource is no longer needed?

    Review:
    Review the process at least annually and after material decommission failures; review execution records continuously as actions occur.
    Specification, template and example →
  • EVD-COST-018Automation control baselineCost Optimization and AutomationReusable

    Automated Resource Decommissioning Control Baseline

    Demonstrate that appropriate non-critical or unused resources can be reduced or removed automatically without compromising workload safety or business continuity.

    Must contain

    • Automation/control name
    • Resource types and environments in scope
    • Trigger metric/event/expiry condition
    • Uses this record

    Ask: What is the worst resource this automation could terminate incorrectly?

    Review:
    Review quarterly and after material incidents, workload architecture changes or provider capability changes.
    Specification, template and example →
  • EVD-COST-022Resource sizing / selection analysisCost Optimization and Resource SelectionReusable

    Resource Sizing & Selection Analysis

    Demonstrate that resource choices are based on workload evidence rather than defaults, guesswork or static lift-and-shift assumptions.

    Must contain

    • Workload/component scope
    • Business and performance requirements
    • Observed or forecast workload characteristics
    • Uses this record

    Ask: What evidence proves this resource family fits the workload characteristic?

    Review:
    Review when workload demand, performance requirements, service options or observed utilization change materially, and at least annually for material workloads.
    Specification, template and example →
  • EVD-COST-023Autoscaling / rightsizing control baselineCost Optimization and Resource AutomationReusable

    Metric-Driven Resource Scaling Control Baseline

    Demonstrate that automated resource adjustment is based on meaningful workload signals and operates within safe, observable limits.

    Must contain

    • Resource/workload scope
    • Input metrics and source
    • Scaling or selection policy
    • Uses this record

    Ask: Which metric is authoritative for demand and why?

    Review:
    Review after material workload changes, scaling incidents, threshold changes or service/platform changes, and at least annually.
    Specification, template and example →
  • EVD-COST-024Pricing model / commitment analysisCost Optimization and Commercial PricingReusable

    Pricing Model & Commitment Analysis

    Demonstrate that pricing models are selected deliberately using workload behavior, financial constraints and risk rather than default purchasing choices.

    Must contain

    • Scope and resource/components covered
    • Historical and forecast usage
    • Steady-state versus elastic usage profile
    • Uses this record

    Ask: Which workload behavior justifies this pricing model?

    Review:
    Review material workloads and management-account commitments at least monthly or when usage, pricing, account structure or workload behavior changes materially.
    Specification, template and example →
  • EVD-COST-027Data transfer cost modelCost Optimization and Network EconomicsReusable

    Data Transfer Cost Model

    Demonstrate that data-transfer cost is understood as an architectural variable and can be traced to specific paths, volumes and business requirements.

    Must contain

    • Workload/component scope
    • Source and destination
    • Traffic direction
    • Uses this record

    Ask: Which path creates the most transfer cost?

    Review:
    Review when architecture, traffic patterns, Regions/AZs, connectivity or transfer pricing change materially.
    Specification, template and example →
  • EVD-COST-028Data transfer optimization design / validationCost Optimization and Network ArchitectureReusable

    Data Transfer Optimization Design & Validation Record

    Demonstrate that transfer-cost optimization decisions have been implemented and validated against real traffic and cost outcomes.

    Must contain

    • Baseline transfer paths/cost
    • Optimization opportunity
    • Candidate architecture/service options
    • Uses this record

    Ask: Which expensive transfer path did this change remove or reduce?

    Review:
    Review after major architecture/network changes and when transfer-cost anomalies or growth appear.
    Specification, template and example →
  • EVD-COST-029Demand profile / forecastCost Optimization and Demand ManagementReusable

    Workload Demand Profile & Forecast

    Demonstrate that demand-management and supply decisions are based on representative workload behavior over time rather than a single utilization snapshot.

    Must contain

    • Workload/component scope
    • Demand metric and source
    • Historical baseline
    • Produces this record

    Ask: What creates the peak demand and how often does it occur?

    Review:
    Review when workload demand patterns, customer behavior, business events or service requirements change materially, and at least quarterly for material workloads.
    Specification, template and example →
  • EVD-COST-030Buffering / throttling control baselineCost Optimization and Demand ManagementReusable

    Demand Buffering & Throttling Control Baseline

    Demonstrate that demand peaks are intentionally controlled so workloads can operate with less provisioned capacity without creating unacceptable delay or retry amplification.

    Must contain

    • Workload/request scope
    • Demand source
    • Buffer/throttle mechanism
    • Uses this record

    Ask: What is the maximum acceptable delay for this request?

    Review:
    Review after material demand changes, retry incidents, queue/backlog saturation, SLO changes or architecture changes, and at least annually.
    Specification, template and example →
  • EVD-COST-031Operational effort / automation assessmentCost Optimization and Operational EfficiencyReusable

    Operational Effort & Automation Assessment

    Demonstrate that operational automation is targeted where it reduces meaningful human effort, error risk and recurring cost rather than being implemented for its own sake.

    Must contain

    • Operational activity
    • Frequency / volume
    • Manual effort per occurrence
    • Produces this record

    Ask: How much human time does this activity consume today?

    Review:
    Review at least quarterly for material workloads and when operating processes, staffing, service architecture or automation tooling changes materially.
    Specification, template and example →
  • EVD-DATA-001Policy / lifecycle standardData Governance, Compliance and CostReusable

    Data Retention & Lifecycle Policy

    Demonstrate that retention and deletion periods are based on business, legal, regulatory, contractual and recovery requirements rather than indefinite storage by default.

    Must contain

    • Data/object class
    • Business/system scope
    • Retention purpose
    • Uses this record

    Ask: What is our highest-cost data class with no explicit retention basis?

    Review:
    Review at least annually and when legal/regulatory, business, recovery or storage requirements materially change.
    Specification, template and example →
  • EVD-GOV-001RegisterGovernance and AccountabilityReusable

    Governance Requirements Register

    Demonstrate that the workload has systematically identified the internal governance requirements that constrain or prioritise its architecture and operation, and that those requirements remain current and owned.

    Must contain

    • Requirement identifier and description
    • Authoritative source, policy, standard or governance rule
    • Affected workload, component or scope
    • Uses this record

    Ask: How do you identify which organisational governance requirements apply to this workload?

    Expected owner:
    Governance Lead, Risk / Compliance / Governance, Enterprise Architecture, Technology Governance, Service Owner
    Review:
    Review on an agreed governance cadence and whenever organisational policy, technology standards, risk appetite or workload context materially changes.
    Specification, template and example →
  • EVD-GOV-002Record / matrixGovernance and AccountabilityReusable

    Governance Control / Implementation Mapping

    Demonstrate that identified governance requirements affect real workload design and operation rather than existing only as policy statements or register entries.

    Must contain

    • Governance requirement or requirement identifier
    • Corresponding workload control, design constraint, platform guardrail or operational mechanism
    • Responsible implementation owner
    • Uses this record

    Ask: For each material governance requirement, what changed in the workload because of it?

    Expected owner:
    Enterprise Architect, Cloud Architect, Security Architect, Platform Team, Service Owner
    Review:
    Update whenever a mapped governance requirement, workload design, control or validation method changes; review alongside the Governance Requirements Register.
    Specification, template and example →
  • EVD-GOV-003RegisterGovernance and AccountabilityReusable

    Governance Exception Register

    Demonstrate that deviations from governance requirements are explicit, authorised, time-bounded and reviewed rather than silently accepted or left indefinitely unresolved.

    Must contain

    • Governance requirement being excepted
    • Scope of the exception
    • Rationale for the deviation
    • Uses this record

    Ask: Which governance requirement is being excepted and for exactly what scope?

    Expected owner:
    Risk / Compliance / Governance, Technology Governance, Service Owner, Technology Leadership
    Review:
    Maintain continuously; review each exception by its expiry/review date and when the relevant requirement, workload risk or compensating control changes.
    Specification, template and example →
  • EVD-GOV-004Requirements / stakeholder needs recordArchitecture and GovernanceReusable

    Stakeholder Requirements Record

    Demonstrate that important technology priorities and requirements originate from understood stakeholder needs rather than undocumented assumptions, and that the impact of not meeting those needs has been considered.

    Must contain

    • Stakeholder group, customer segment or internal user group
    • Need, problem, outcome or expectation in clear language
    • Source of the need, such as interview, workshop, feedback, operational data or business objective
    • Produces this record

    Ask: What evidence shows this is a real stakeholder need rather than an internal assumption?

    Review:
    Review when stakeholder needs, business priorities or operating context materially change, and at an agreed periodic cadence for long-lived services.
    Specification, template and example →
  • EVD-GOV-005Governance framework / decision modelArchitecture and GovernanceReusable

    Decision Governance Framework

    Enable high-quality, high-velocity decisions by making authority, decision levels, escalation routes, required evidence, benefit/risk criteria and review expectations explicit before conflicts arise.

    Must contain

    • Purpose, scope and governance principles for technology and operational decisions
    • Decision classes or levels, including how materiality, reversibility and cross-organisational impact affect the required governance path
    • Named or role-based decision authorities for each decision class
    • Uses this record

    Ask: Can a delivery team tell which decisions it may make without escalation?

    Expected owner:
    Technology Executive, Risk / Compliance / Governance, Architecture Governance
    Review:
    Review at least annually and whenever organisational authority, risk tolerance, regulatory obligations or delivery operating models materially change.
    Specification, template and example →
  • EVD-OPS-002review assurance recordOperational ExcellenceReusable

    Operational Readiness Review

    Demonstrate that operational readiness has been evaluated consistently before production deployment or significant change, rather than relying on informal confidence or undocumented checks.

    Must contain

    • Workload or service, scope, environment and review date
    • Named review owner and participating roles
    • Readiness criteria and results across monitoring, incident response, recovery, security, configuration, performance, documentation/training and dependencies
    • Produces this record
    • Uses this record

    Ask: What evidence proves each critical readiness criterion is satisfied?

    Expected owner:
    Service Owner, Operations Manager
    Review:
    Before production launch and material operational change; repeat periodically where continuing assurance is required.
    Specification, template and example →
  • EVD-PERF-001Benchmark plan / resultsPerformance EfficiencyReusable

    Performance Benchmark Plan & Results

    Demonstrate that performance claims and architecture changes are based on representative, repeatable measurements rather than generic benchmarks, perception or one-off tests.

    Must contain

    • Benchmark objective and decision/question being informed
    • Relevant performance/NFR target or user requirement
    • Baseline implementation/configuration
    • Uses this record

    Ask: What architecture decision will this benchmark change?

    Review:
    Create for material performance-sensitive architecture choices and rerun when the tested component, configuration, workload profile or performance requirement changes materially.
    Specification, template and example →
  • EVD-RISK-001Risk registerRisk and GovernanceReusable

    Risk Register

    Make material risks visible to the people making technology and business decisions so tradeoffs can be evaluated with evidence, treatment is owned, and residual risk is explicit rather than implicit.

    Must contain

    • Stable risk identifier and concise risk statement
    • Source, context or decision that gives rise to the risk
    • Affected workload, service, capability or business outcome
    • Uses this record

    Ask: Which current risks could materially change the decision we are making?

    Expected owner:
    Risk / Compliance / Governance, Service Owner, Technology Executive
    Review:
    Maintain continuously; review at material decisions, governance reviews, significant change and whenever assumptions, exposure or treatment status changes.
    Specification, template and example →
  • EVD-SEC-001Threat model / analysisSecurity and RiskReusable

    Threat Model

    Demonstrate that material security threats are systematically identified and prioritised against the actual workload architecture, that mitigation choices respond to those threats, and that the analysis is refreshed as the workload or external threat landscape changes.

    Must contain

    • Workload/system scope and security-relevant business assets
    • Relevant architecture, data flows and trust boundaries
    • Threat actors, threat sources and material assumptions
    • Uses this record

    Ask: What are the workload's most material threat scenarios today, and why are they prioritised?

    Expected owner:
    Security Architect, Security Engineer, Security Leader, Risk Manager, Service Owner
    Review:
    Review on an agreed security/risk cadence and after material architecture, data-flow, trust-boundary, threat-intelligence, vulnerability or incident changes that could alter the threat picture.
    Specification, template and example →
  • EVD-SUS-002SLA / service level sustainability assessmentSustainability and Service LevelsReusable

    Sustainability Service-Level Trade-off Assessment

    Demonstrate that service levels are deliberately balanced against sustainability goals rather than inherited or over-engineered by default.

    Must contain

    • Workload/service scope
    • Current SLA/SLO target
    • Business need
    • Uses this record

    Ask: What business outcome requires this service level?

    Review:
    Review at least annually and when workload criticality, user expectations, sustainability goals or major architecture assumptions change.
    Specification, template and example →
  • EVD-SUS-003Team device / resource sustainability assessmentSustainability and End-User ComputingReusable

    Team Resource Sustainability Assessment

    Demonstrate that team-member computing resources are proportionate to actual activity and avoid unnecessary device, power and lifecycle impact.

    Must contain

    • Team/persona
    • Activity performed
    • Current device/resource
    • Produces this record

    Ask: What activity requires this device or resource profile?

    Review:
    Review at least annually and when team roles, development environments, device standards or major compute requirements change.
    Specification, template and example →
  • EVD-SUS-008Elastic storage / capacity control baselineSustainability and Storage EfficiencyReusable

    Elastic Storage Capacity Control Baseline

    Demonstrate that storage capacity and performance grow with real need while minimizing idle provisioned capacity.

    Must contain

    • Storage scope
    • Current utilization
    • Target utilization band
    • Produces this record

    Ask: What percentage of provisioned storage is actually used?

    Review:
    Review after material data growth, storage-platform or threshold changes, and at least annually.
    Specification, template and example →
  • EVD-SUS-010Backup criticality / re creatability assessmentSustainability and Data ProtectionReusable

    Backup Value & Re-creatability Assessment

    Demonstrate that backup scope protects valuable data without consuming storage for data that can be recreated cheaply or has no recovery value.

    Must contain

    • Dataset
    • Business value
    • Recovery requirement
    • Produces this record

    Ask: Could this data be recreated reliably?

    Review:
    Review with backup policy changes, new datasets and material recovery/compliance requirement changes.
    Specification, template and example →
  • EVD-COST-010Roles / permissions matrixCost Optimization and Access GovernanceReusable

    Cloud Governance Roles & Permissions Matrix

    Demonstrate that policy-defined cloud actions are assigned consistently to groups and roles rather than to individuals ad hoc.

    Must contain

    • Group/role name
    • Business/technical purpose
    • Permitted actions

    Ask: Which role can create the most expensive resources and why?

    Review:
    Review at least quarterly and on material organization or responsibility changes.
    Specification, template and example →
  • EVD-SEC-007Security baseline / infrastructure as codeSecurity Engineering and AutomationReusable

    Standard Security Control Baseline / IaC Template

    Demonstrate that standard security controls can be deployed repeatably and verified automatically rather than relying on workload teams or a central security team to reimplement controls manually for each deployment.

    Must contain

    • Baseline/control package identity, version and owner
    • Security control objectives implemented by the baseline
    • Infrastructure-as-code, policy-as-code or configuration definitions

    Ask: Which standard security controls still require manual per-workload implementation?

    Expected owner:
    Security Engineer, DevSecOps Engineer, Cloud Platform Engineer, Security Architect
    Review:
    Review with every material baseline/template version and at a defined security-engineering cadence; retain version history and supported versions.
    Specification, template and example →
  • EVD-COMP-001RegisterCompliance and AssuranceReusable

    Compliance Requirements Register

    Demonstrate that the workload has applied due diligence to determine its compliance obligations and that architecture and technology choices are informed by the frameworks, laws, contracts or standards that actually apply.

    Must contain

    • Compliance requirement identifier and concise obligation
    • Framework, law, regulation, contract, standard or organisation-adopted compliance source
    • Reason the requirement applies to the workload

    Ask: Which regulatory, industry, contractual or organisation-adopted compliance frameworks apply to this workload, and why?

    Expected owner:
    Compliance Officer, Data Protection Officer, Risk / Compliance / Governance, Service Owner
    Review:
    Review on a defined compliance cadence and whenever relevant law, regulation, industry standard, contractual obligation, data classification, geography, product claim or workload scope changes.
    Specification, template and example →
  • EVD-COST-015Metric catalogueCost Optimization and Business MetricsReusable

    Workload Business Output Metric Catalogue

    Demonstrate that each material workload has a small set of business or customer output metrics that can be combined with cost to assess efficiency rather than spend alone.

    Must contain

    • Workload/service scope
    • Business output metric name
    • Definition/formula

    Ask: Which metric best explains why this workload's cost should rise or fall?

    Review:
    Review quarterly and when workload purpose, customer behavior or business process materially changes.
    Specification, template and example →
  • EVD-SEC-022Contact and escalation registerSecurity Incident ResponseReusable

    Incident Response Contact & Escalation Register

    Demonstrate the right people and external resources can be reached rapidly during an incident.

    Must contain

    • Response roles, named owner and alternate
    • Preferred and independent backup contact methods
    • Coverage windows, on-call rotation and escalation thresholds

    Ask: Can responders reach legal and cloud suppliers if corporate identity is unavailable?

    Expected owner:
    Security Operations / Incident Response, Security Engineer, Service Owner
    Review:
    After a material incident, organisational change or exercise, and on a defined risk-based cadence.
    Specification, template and example →
  • EVD-ARCH-005Decision / governance recordArchitecture and GovernanceReusable

    Architecture / Design Decision Record

    Provide traceable evidence that significant technical decisions were deliberate, appropriately challenged and aligned with business, risk and engineering considerations rather than being undocumented implementation choices.

    Must contain

    • Decision title, date, status and decision owner
    • Problem, opportunity or context that required a decision
    • Relevant business, technical, operational, security or regulatory objectives and constraints

    Ask: What evidence shows that the alternatives were genuinely evaluated rather than merely listed?

    Review:
    Create when a material decision is made. Update status when accepted, rejected or superseded, and revisit when key assumptions, constraints, risks or business objectives materially change.
    Specification, template and example →
  • EVD-SEC-008Security architecture / network modelSecurity and GovernanceReusable

    Network Segmentation & Traffic Flow Model

    Demonstrate that network topology is deliberately layered by function, data sensitivity and behaviour, and that only the flows each workload needs are permitted, both at layer boundaries and inside them.

    Must contain

    • Scope: workloads, environments, VPCs/networks and accounts covered
    • Layer inventory with the rationale for each layer (function, data sensitivity, behaviour)
    • Components placed in each layer, including managed services and private endpoints

    Ask: Which components could reach your most sensitive data store today, and do all of them need to?

    Expected owner:
    Network Engineer, Cloud Security Architect, Cloud Platform Engineer
    Review:
    Review when workloads, network topology or data sensitivity change materially, and reconcile periodically against actual configuration.
    Specification, template and example →
  • EVD-SEC-002Security architecture / account modelSecurity and GovernanceReusable

    Cloud Account / Environment Segmentation Model

    Demonstrate that security boundaries are deliberately established at account/environment level so workloads, teams and environments are isolated appropriately and centrally governed controls are inherited consistently.

    Must contain

    • Current account/environment/workload inventory in scope
    • Business, environment, sensitivity or compliance rationale for major boundaries
    • Organisation/grouping structure and inherited policy/guardrail hierarchy

    Ask: Which workloads could currently affect each other because they share the same administrative or security boundary?

    Expected owner:
    Cloud Security Architect, Cloud Platform Engineer, Security Engineer, Cloud Governance
    Review:
    Review after material organisation, account, environment, ownership, guardrail or compliance changes and periodically against the actual cloud estate.
    Specification, template and example →
  • EVD-REQ-002Quality attribute requirements specificationArchitecture and GovernanceReusable

    Non-Functional Requirements Specification

    Provide an explicit contract for the qualities and operating outcomes architecture must deliver, so that material risks can be translated into measurable requirements and verified with objective evidence.

    Must contain

    • Quality attribute/category
    • Requirement identifier and clear requirement statement
    • Business/stakeholder/risk source or rationale

    Ask: Which production failure modes or business impacts does each critical NFR protect against?

    Review:
    Establish during discovery/design and review whenever business criticality, workload demand, threat/compliance context, service commitments or architecture materially change.
    Specification, template and example →
  • EVD-ARCH-008Interface / service contractArchitecture and GovernanceReusable

    API / Service Contract

    Demonstrate that producers and consumers have an explicit shared interface definition that supports independent change without relying on undocumented implementation assumptions or accidental compatibility.

    Must contain

    • Contract identity, service/API name, owner and current version/status
    • Intended consumers, scope and interface purpose
    • Operations, endpoints, events or callable behaviours in scope

    Ask: What behaviour do consumers rely on that is not explicitly represented in the contract?

    Review:
    Review whenever the interface, schemas, behaviour, compatibility policy or lifecycle materially changes, and keep the current contract version aligned with the deployed/supported interface.
    Specification, template and example →
Open the full evidence library →

Use this to

Relevant journeys

A guided route for working out who is accountable, who does the work, who decides and who challenges it.