Operational Readiness Review
Demonstrate that operational readiness has been evaluated consistently before production deployment or significant change, rather than relying on informal confidence or undocumented checks.
Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.
See supporting documents (2) →Why it matters
The risk this evidence addresses
Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.
A workload is deployed without sufficient evidence that the people, processes, controls and supporting systems required to operate it safely and reliably are ready.
Derived from the legacy Operational Readiness practice and report/checklist family, which focus on validating safe production operation and reducing failures or unplanned downtime.
Use a consistent, evidence-based Operational Readiness Review before production deployment and material operational change, with gaps, conditions and ownership explicitly recorded.
A structured record showing whether a workload or service is ready to operate safely and reliably, what gaps or conditions remain, who owns them and what decision was made.
Ownership
Who is accountable
Producing the record and owning the decision it captures are different jobs.
Accountable — owns the decision
Owns or signs off the decision captured by this evidence.
Produces and contributes
Gathers the evidence and completes the record.
- Service Owner
- Operations Manager
Consumes and reviews
Relies on this record to judge whether the relevant control is operating.
Operational roles are source-supported. Executive consumption can be added later where it is a product-model inference rather than a source-derived accountability claim.
The Service Owner or equivalent accountable service role should own the readiness decision. Operations and relevant engineering, security and recovery roles provide evidence and review input. Material residual risk should be visible to the role authorised to accept it.
Challenge
What to ask your team
Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.
- Q01
What evidence proves each critical readiness criterion is satisfied?
- Q02
Which failed or conditional items could create customer, operational, security or recovery impact?
- Q03
Who is accountable for accepting any residual risk?
- Q04
Have recovery, monitoring, alerting and incident-response capabilities actually been exercised?
- Q05
What has changed since the last review that could invalidate previous evidence?
Specification
What it must contain, and what makes it credible
Minimum expected content
- Workload or service, scope, environment and review date
- Named review owner and participating roles
- Readiness criteria and results across monitoring, incident response, recovery, security, configuration, performance, documentation/training and dependencies
- Identified gaps, exceptions and material risks
- Actions, owners and due dates
- Overall readiness decision or status, including any conditions
- Approval or acceptance record and next review date where applicable
What good looks like
- Criteria are specific enough to test rather than being simple yes/no assertions
- Claims of readiness are backed by referenced evidence such as recovery tests, monitoring checks or incident exercises
- Exceptions and failed checks remain visible rather than being removed from the final record
- Every material gap has a named owner and due date
- The final readiness decision identifies who accepted any residual risk or conditions
- The review is current for the workload version, environment and change being approved
Warning signs
- Checklist completed as a documentation exercise with no supporting evidence
- Generic organisation-wide checklist copied without workload-specific acceptance criteria
- All items marked complete despite known unresolved risks
- No distinction between required evidence, reviewer judgement and remediation actions
- A readiness status with no named decision owner
- A historic ORR reused after material architecture, dependency or operating-model change
Checklist
Checklist and template structure
Use this structure to record an Operational Readiness Review. Tailor the criteria to the workload's risks and operating model; do not treat completion of the template itself as proof of readiness.
- 01
Scope and context
Identify the workload/service, environment, change or release, review date and participants.
- 02
Readiness criteria and evidence
Record each readiness area, acceptance criterion, result and the evidence used to support the result.
- 03
Risks, gaps and exceptions
Record failed or conditional items, impact and any accepted exceptions.
- 04
Actions and remediation
Assign every required remediation action to an owner and due date.
- 05
Readiness decision
Record Ready, Ready with Conditions, or Not Ready and explain the basis for the decision.
- 06
Approval and next review
Record decision owner, approvers/acceptors, date, conditions and next review where applicable.
Adopt this artefact
MarkdownThe blank file contains one section per heading shown above, with the guidance kept as a quote you can delete.
Example
Worked example — customer account service release
Illustrative Operational Readiness Review for a fictional customer account service before a material production release.
- Scope and context
- Customer Account Service v3.4; production release; review held 3 days before planned deployment with Service Owner, Operations Manager and DevOps Engineer.
- Readiness criteria and evidence
- Monitoring dashboards and alerts reviewed; production runbook updated; backup restore test passed; on-call escalation exercised; two dependency checks remain conditional.
- Risks, gaps and exceptions
- Third-party identity provider failover has not been exercised in the last 90 days. Impact is customer login disruption if the primary endpoint fails.
- Actions and remediation
- DevOps Engineer to run failover exercise within 5 working days. Operations Manager to confirm alert routing and update the support playbook.
- Readiness decision
- Ready with Conditions. Release may proceed because the residual risk is understood, monitoring is in place and the outstanding action is time-bound.
- Approval and next review
- Service Owner accepted the condition and residual risk. Follow-up review scheduled after the failover exercise.
Illustrative example only. It demonstrates the expected shape of credible evidence; it is not a recommendation for specific operational thresholds.
Illustrative content for guidance. Not a statement about any real organisation.
Document Library
Supporting documents and examples
These are separate reusable resources that help you produce evidence. The definition above explains what to demonstrate; the documents show how you might record it. They are not themselves proof that a control is operating.
Relationships
Where this evidence is used
Practices that expect it
- COST11-BP01 — Perform automation for operations
- OPS-ORR-001 — Use a consistent Operational Readiness Review
- OPS06-BP02 — Test deployments
- OPS06-BP03 — Employ safe deployment strategies
- OPS06-BP04 — Automate testing and rollback
- OPS07-BP03 — Use runbooks to perform procedures
- OPS09-BP01 — Measure operations goals and KPIs with metrics
- OPS10-BP04 — Define escalation paths
- OPS11-BP04 — Perform knowledge management
- REL01-BP04 — Monitor and manage quotas
- REL03-BP01 — Choose how to segment your workload
- REL05-BP04 — Fail fast and limit queues
- REL05-BP07 — Implement emergency levers
- REL08-BP05 — Deploy changes with automation
- REL09-BP04 — Perform periodic recovery of the data to verify backup integrity and processes
- REL12-BP04 — Test resiliency using chaos engineering
- REL13-BP05 — Automate recovery
Role journeys that reference it
- Not yet placed in an authored role journey. The roles that own, produce and use it are listed above.
Related artefacts from the previous guide
Review cadenceBefore production launch and material operational change; repeat periodically where continuing assurance is required.
Use this to
Relevant journeys
Guided routes that check this record against a reference quality model.