EVD-COST-022Evidence definitionCost Optimization and Resource SelectionResource sizing / selection analysisReusableReference content

Resource Sizing & Selection Analysis

Demonstrate that resource choices are based on workload evidence rather than defaults, guesswork or static lift-and-shift assumptions.

Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.

Why it matters

The risk this evidence addresses

Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.

RiskWAG interpretation

Resources are over- or under-provisioned because type, size and quantity are chosen without reliable workload characteristics and performance data.

Synthesised from current AWS COST06-BP02 guidance.

Control objectiveWAG guidance

Select resource type, size and quantity using workload data, performance requirements and cost evidence, with explicit review triggers as conditions change.

A data-backed analysis that translates workload characteristics, performance requirements and usage patterns into a justified resource type, size and quantity selection.

Ownership

Ownership and review

No accountable role is recorded for this record yet. These are the roles involved in producing and using it.

Produces and contributes

Gathers the evidence and completes the record.

Consumes and reviews

Relies on this record to judge whether the relevant control is operating.

Challenge

What to ask your team

Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.

  1. Q01

    What evidence proves this resource family fits the workload characteristic?

  2. Q02

    What is the expected peak and how much headroom is intentional?

  3. Q03

    Which metric would invalidate the current size selection?

  4. Q04

    Would a different resource family deliver the same outcome at lower cost?

Specification

What it must contain, and what makes it credible

Minimum expected content

  • Workload/component scope
  • Business and performance requirements
  • Observed or forecast workload characteristics
  • CPU, memory, storage, throughput and network requirements where relevant
  • Historical utilization or benchmark data
  • Candidate resource types and sizes
  • Quantity/capacity assumptions
  • Cost comparison
  • Performance headroom and resilience constraints
  • Selected option and rationale
  • Review trigger

What good looks like

  • Selection is traceable to workload data
  • Peak and cyclic demand are considered rather than averages alone
  • Resource characteristics match the workload bottleneck
  • Cost and performance are evaluated together
  • Headroom is explicit rather than accidental overprovisioning
  • The analysis can be repeated when workload behavior changes

Warning signs

  • Selecting provider defaults without workload evidence
  • Sizing from average utilization only
  • Copying on-premises capacity directly into cloud resources
  • Ignoring memory, storage or network constraints
  • Treating maximum size as a substitute for resilience
  • Keeping the original size indefinitely after deployment

Measurement metadata expected

  • Percentage of material resources with current sizing evidence
  • Observed utilization versus selected capacity
  • Percentage of resources outside agreed utilization/headroom bands
  • Savings or avoidance from rightsizing actions
  • Age of sizing analysis

Checklist

Checklist and template structure

Use this analysis to make the resource choice explainable and repeatable. Keep durable architecture trade-offs in an ADR where the selection changes architecture.

  1. 01

    Scope and requirements

    Identify the workload/component and the business, performance and resilience requirements it must satisfy.

  2. 02

    Workload evidence

    Record benchmark, historical utilization, forecast demand and key resource characteristics.

  3. 03

    Resource options

    Compare candidate resource families, sizes and quantities with cost/performance implications.

  4. 04

    Selection and rationale

    Record the selected resource shape, intended headroom and why it best fits the evidence.

  5. 05

    Review triggers

    Define metrics or workload changes that require re-sizing or re-selection.

Adopt this artefact

CSV

The blank file contains one column per template section, in the order shown above, plus a single empty row to start from.

Review cadenceReview when workload demand, performance requirements, service options or observed utilization change materially, and at least annually for material workloads.