EVD-GOV-002Evidence definitionGovernance and AccountabilityRecord / matrixReusableReference content

Governance Control / Implementation Mapping

Demonstrate that identified governance requirements affect real workload design and operation rather than existing only as policy statements or register entries.

Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.

Why it matters

The risk this evidence addresses

Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.

RiskWAG interpretation

Governance requirements are documented but never translated into workload-specific controls or constraints, so teams cannot demonstrate that organisational governance actually changed implementation or operation.

Directly reflects the AWAFQ OPS01-BP03 worked example's distinction between requirement identification and implementation evidence and current AWS's requirement to incorporate governance into the workload and prove conformance.

Control objectiveWAG guidance

Trace applicable governance requirements to concrete workload controls, design constraints or operating mechanisms with ownership, validation method and implementation status.

A traceability record showing how each applicable governance requirement is translated into workload controls, standards, design constraints or operating mechanisms and how implementation is validated.

Ownership

Ownership and review

No accountable role is recorded for this record yet. These are the roles involved in producing and using it.

Produces and contributes

Gathers the evidence and completes the record.

  • Enterprise Architect
  • Cloud Architect
  • Security Architect
  • Platform Team
  • Service Owner

Consumes and reviews

Relies on this record to judge whether the relevant control is operating.

Role mapping follows the AWAFQ OPS01-BP03 responsibilities: architecture/platform/security translate requirements into workload constraints and controls; workload/governance/operations consume the mapping to implement and demonstrate conformance. No evidence-level accountability is inferred.

Mappings should be agreed between the workload and relevant governance/control owners where interpretation is material. Approval of a mapping is not a substitute for evidence that the control or mechanism is actually implemented.

Challenge

What to ask your team

Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.

  1. Q01

    For each material governance requirement, what changed in the workload because of it?

  2. Q02

    Which control or mechanism addresses the requirement?

  3. Q03

    Who is responsible for that implementation?

  4. Q04

    How is implementation validated?

  5. Q05

    Is the mapping used during design/change or only reconstructed later?

Specification

What it must contain, and what makes it credible

Minimum expected content

  • Governance requirement or requirement identifier
  • Corresponding workload control, design constraint, platform guardrail or operational mechanism
  • Responsible implementation owner
  • Validation or conformance method
  • Current implementation/validation status

What good looks like

  • Every material mapping is traceable back to an applicable governance requirement
  • Mappings identify actual workload mechanisms rather than restating the source policy
  • Responsible implementation ownership is explicit
  • Validation methods are specific enough to determine whether the mapped mechanism is operating
  • The mapping is used during design and change activity, not assembled retrospectively for audit

Warning signs

  • The mapping simply copies requirement text into a second column
  • Controls are listed with no traceability to the governance requirement they address
  • Implementation owner or validation method is missing
  • A policy-as-code rule is assumed to prove the whole governance requirement when it validates only one technical aspect
  • The matrix exists only for assurance reviews and is not used when workload changes are designed

Measurement metadata expected

  • Percentage of applicable governance requirements with an implementation/control mapping
  • Percentage of mapped controls with an explicit validation method
  • Percentage of material mappings with a current implementation status

Checklist

Checklist and template structure

Map each applicable governance requirement to the actual workload mechanism that addresses it. Keep requirements, implementation and validation distinct so reviewers can challenge whether the requirement is truly being met.

  1. 01

    Governance requirement

    Reference the applicable requirement from the Governance Requirements Register.

  2. 02

    Workload control / implementation mechanism

    Describe or reference the actual control, standard, design constraint, guardrail or operational process that addresses the requirement.

  3. 03

    Implementation owner

    Name the role/person responsible for implementing or maintaining the mapped mechanism.

  4. 04

    Validation method

    State how implementation/conformance is checked, including automated or manual methods where appropriate.

  5. 05

    Current status

    Record whether implementation is complete, partial, missing or subject to exception.

Adopt this artefact

CSV

The blank file contains one column per template section, in the order shown above, plus a single empty row to start from.

Relationships

Where this evidence is used

Review cadenceUpdate whenever a mapped governance requirement, workload design, control or validation method changes; review alongside the Governance Requirements Register.