Architecture / Design Decision Record

Provide traceable evidence that significant technical decisions were deliberate, appropriately challenged and aligned with business, risk and engineering considerations rather than being undocumented implementation choices.

Evidence definition: what you need to demonstrate, why it matters and how to assess it. This is not a completed document.

See supporting documents (1) →

Why it matters

The risk this evidence addresses

Read this first: this record exists to demonstrate that the relevant control is defined and operating — not to complete a document.

RiskWAG interpretation

Material technology and architecture decisions are made without a durable record of the context, alternatives, trade-offs, risks, rationale, decision authority and review status, making them difficult to govern, challenge, explain or revisit.

Derived from the reviewed Evaluate tradeoffs, Manage benefits and risks and data-driven architectural choices sources. This is a WAG v2 synthesis rather than a verbatim source field.

Control objectiveWAG guidance

Record significant architecture and design decisions consistently, including the context, alternatives considered, evaluation criteria, trade-offs, risks, rationale, consequences, decision owner and review/supersession status.

A durable record of a significant technology or architecture decision showing what was decided, why it was decided, which alternatives and trade-offs were considered, what risks or consequences remain and who owns the decision.

Ownership

Ownership and review

No accountable role is recorded for this record yet. These are the roles involved in producing and using it.

Produces and contributes

Gathers the evidence and completes the record.

Consumes and reviews

Relies on this record to judge whether the relevant control is operating.

Producer roles are source-supported across the reviewed trade-off, risk-management and data-driven architecture practices. Technology Executive and Risk / Compliance / Governance consumption is source-supported for material decisions; no single accountable role is inferred for all decisions.

The decision authority should match the materiality and scope of the decision. Architects or technical leads will often author the record; product, operations, security, finance or risk roles should contribute where their concerns are materially affected. Strategic or high-risk decisions may require technology executive or governance-forum acceptance.

Challenge

What to ask your team

Use these when the artefact is presented to you. Each one is designed to expose evidence that exists but does not hold.

  1. Q01

    What evidence shows that the alternatives were genuinely evaluated rather than merely listed?

  2. Q02

    Which business or risk assumptions would cause this decision to change if they stopped being true?

  3. Q03

    What downside, technical debt or residual risk is being accepted and by whom?

  4. Q04

    How does the decision align with the intended business outcome rather than only a technical preference?

  5. Q05

    What data or operational evidence supports the decision where measurable evidence should exist?

  6. Q06

    How will someone know that this record has been superseded or is no longer applicable?

Specification

What it must contain, and what makes it credible

Minimum expected content

  • Decision title, date, status and decision owner
  • Problem, opportunity or context that required a decision
  • Relevant business, technical, operational, security or regulatory objectives and constraints
  • Options or alternatives genuinely considered
  • Evaluation criteria and material trade-offs
  • Decision and rationale
  • Expected benefits and positive consequences
  • Risks, disadvantages, technical debt and mitigation where material
  • Affected systems, services or stakeholders
  • Follow-up actions and owners where required
  • Approval, acceptance or decision authority where relevant
  • Review trigger/date and links to superseding or related decisions

What good looks like

  • The decision is specific enough that a reviewer can tell what changed or was chosen
  • Alternatives are plausible options that were actually considered, not straw-man choices added after the fact
  • The rationale connects evidence and evaluation criteria to the final decision
  • Trade-offs include material cost, performance, reliability, security, operational and organisational consequences where relevant
  • Known risks and technical debt remain visible and have mitigation or explicit acceptance
  • The record identifies the person or forum with authority to make or accept the decision
  • Status and supersession are maintained so obsolete decisions are not mistaken for current direction
  • Supporting evidence such as performance data, cost analysis, risk analysis or diagrams is linked when it materially influenced the decision

Warning signs

  • Recording only the final choice with no context or rationale
  • Listing alternatives without showing how they were evaluated
  • Using a decision record to retrospectively justify a decision that had already been made without challenge
  • Treating every low-level implementation choice as a formal architecture decision
  • Omitting known risks, disadvantages or dissenting stakeholder concerns
  • No named decision owner or approval authority
  • Never updating a record when the decision is superseded
  • Copying a generic template without evidence specific to the actual decision

Checklist

Checklist and template structure

Use this record for decisions important enough that another person should be able to understand later what was decided, why, what alternatives were considered and what consequences or risks were accepted. Keep the record concise and link supporting analysis rather than copying it in full.

  1. 01

    Decision metadata

    Record title, date, status, decision owner, author and affected scope.

  2. 02

    Context and objectives

    Describe the problem or opportunity, relevant constraints and the outcomes the decision needs to support.

  3. 03

    Options considered

    Record the realistic alternatives that were evaluated and enough detail to understand how they differ.

  4. 04

    Evaluation criteria and evidence

    State the criteria used and link the data, analysis, risks or other evidence that informed the comparison.

  5. 05

    Decision and rationale

    State the chosen option clearly and explain why it was selected against the stated criteria.

  6. 06

    Trade-offs, risks and consequences

    Record material benefits, disadvantages, risks, technical debt and mitigation or acceptance decisions.

  7. 07

    Follow-up actions

    optional

    Capture actions arising from the decision, including owners and due dates where relevant.

  8. 08

    Stakeholder input and decision authority

    Record material stakeholder input, the decision maker or approving forum and any explicit risk acceptance.

  9. 09

    Review, status and supersession

    Record review triggers or dates, current status and links to decisions that supersede or materially modify this one.

  10. 10

    Supporting evidence and related records

    optional

    Link supporting analysis, architecture diagrams, requirements, risk assessments, performance/cost evidence and related decisions.

Adopt this artefact

Markdown

The blank file contains one section per heading shown above, with the guidance kept as a quote you can delete.

Document Library

Supporting documents and examples

These are separate reusable resources that help you produce evidence. The definition above explains what to demonstrate; the documents show how you might record it. They are not themselves proof that a control is operating.

Relationships

Where this evidence is used

Practices that expect it

Role journeys that reference it

  • Not yet placed in an authored role journey. The roles that own, produce and use it are listed above.

Review cadenceCreate when a material decision is made. Update status when accepted, rejected or superseded, and revisit when key assumptions, constraints, risks or business objectives materially change.