Who normally owns: Protect compute and workloads
Decide how compute is built, hardened, patched and accessed, and how software running on it is checked before it is trusted.
Reference model, not an assessment. No evidence from your organisation has been reviewed, and nothing here is saved.
What needs to be true
Servers, containers and functions start from a known secure state and stay patched, with little need for hands-on access.
Decide how compute is built, hardened, patched and accessed, and how software running on it is checked before it is trusted.
Accountable
Who would normally answer for this
Named as capabilities, not as job titles that must exist in your structure.
Responsible
Who typically does the work
Runs the activity and keeps the evidence current.
- responsible
Set security requirements
Define the perform vulnerability management standard, risks and exceptions.
- responsible
Build and operate controls
Implement and test the controls needed to perform vulnerability management.
- consulted
Accept operational risk
Review coverage, exception decisions and business consequences.
Contributes
Who should be involved
Supplies input, review or challenge without owning the outcome.
Decision rights
Who decides what
Guide interpretation — proposed by the Well-Architected Guide, not taken from the AWS framework.
- The platform team would normally decide the approved base images and patch windows.
- The security leader would normally be expected to set the maximum time allowed to fix a critical vulnerability.
Risk acceptance
Who can commonly accept the risk
Guide interpretation — proposed by the Well-Architected Guide, not taken from the AWS framework.
The platform team can schedule routine patching. Leaving a known critical vulnerability open would commonly require acceptance by the service owner and security leader.
Challenge and assurance
Who provides independent challenge
Independent challenge usually sits outside the team doing the work.
Ask these in the room
- Which compute types and dependencies are outside routine vulnerability scanning?
- How do we prioritise an actively exploited issue over a high-scoring but unreachable finding?
- Can we trace a sample finding from discovery through verified closure?
- How much critical exposure remains open beyond policy deadlines?
- Where do our compute and container base images originate?
- What prevents a team from deploying an unapproved or outdated image?
- Can we show the hardening recipe, tests and deployed image versions?
- Which critical workloads still run unsupported image versions?
- Which routine activities still require an engineer to log into compute?
- What would prevent direct SSH access on production instances?
- Can we show an approved runbook execution and its audit trail?
- How often was emergency interactive access needed last quarter?
Evidence expected
What ownership should be able to show
Records published in the evidence library: what each proves, the minimum it should contain, and how often it is reviewed.
- EVD-SEC-007Core
Standard Security Control Baseline / IaC Template
Demonstrate that standard security controls can be deployed repeatably and verified automatically rather than relying on workload teams or a central security team to reimplement controls manually for each deployment.
Must contain
- Baseline/control package identity, version and owner
- Security control objectives implemented by the baseline
- Infrastructure-as-code, policy-as-code or configuration definitions
- Intended deployment scope/accounts/environments/workload classes
- Required inputs and permitted configuration variation
- Automated unit/static/policy/security tests
- Deployment pipeline and approval/change controls
- Guardrails preventing or detecting unsafe configuration
- Self-service consumption path for workload teams where applicable
- Drift/conformance monitoring after deployment
- Rollback/recovery and backup/version-retention approach
- Supported/deprecated versions and migration expectations
- Change history and review date
What good looks like
- Baseline definitions are version controlled and reviewed like production code
- Tests fail insecure or non-compliant changes before deployment
- Secure defaults require less effort than bypassing them
- Workload teams can consume approved controls without bespoke security-team tickets for routine cases
- Post-deployment drift is detected
- Baseline changes can be rolled back or recovered
- Control objectives are traceable to the baseline and its validation evidence
- Version/deprecation lifecycle is managed
Not good enough
- A wiki page describes the baseline but teams implement it manually
- A central security team deploys every control by request
- Templates exist but have no automated security or policy tests
- Workload teams fork templates and cannot consume upstream security fixes
- Baseline success is measured by template deployment, not resulting control conformance
- Emergency manual changes are never reconciled back into code
- No supported-version or migration policy exists
- Reviewed by:
- Software Engineer,Team Lead / Manager,Service Owner
- Review:
- Review with every material baseline/template version and at a defined security-engineering cadence; retain version history and supported versions.
- Expected by:
- SEC06-BP02, SEC06-BP04, SEC06-BP05
- EVD-SEC-005Core
Security Threat & Recommendation Review Log
Demonstrate that emerging security information is systematically consumed, assessed against the workload and converted into timely mitigation, threat-model/control updates or explicit no-action decisions.
Must contain
- Source and advisory/threat/recommendation identifier
- Publication/observed date and severity/priority where applicable
- Affected technology, workload, dependency or security capability
- Applicability assessment and rationale
- Potential business/security impact
- Required mitigation, patch, configuration or evaluation action
- Named owner and target date
- Current status and closure evidence
- Reference to Threat Model, Risk Register or control objective where materially affected
- Decision/rationale where no action is required
- Last review timestamp and source-monitoring cadence
What good looks like
- Primary and trusted external sources are defined rather than relying on ad hoc discovery
- High-severity items have an expedited triage path
- Applicability is assessed against actual workload inventory/dependencies
- Actions are tracked through closure
- Material changes update threat models, risks or control objectives rather than remaining isolated tickets
- No-action decisions retain rationale
- Provider recommendations are evaluated, not blindly implemented
Not good enough
- Teams subscribe to security bulletins but cannot show what was assessed
- Every advisory generates work regardless of applicability
- Only CVEs are tracked while cloud/provider configuration recommendations are ignored
- A threat-intelligence feed is treated as evidence without showing resulting decisions
- Items are marked closed when a ticket is created rather than when mitigation is verified
- New security features are adopted because they are new rather than because they improve the risk/control posture
- Review:
- Maintain continuously or at an agreed security-review cadence, with expedited review for high-severity or actively exploited threats.
- Expected by:
- SEC06-BP01, SEC06-BP02
- EVD-SEC-017Core
Security Log Source & Retention Register
Demonstrate that security-relevant logs are switched on across accounts, services and applications, kept for the right length of time, protected, and can be retrieved quickly when an investigation or audit needs them.
Must contain
- Log sources in scope: account activity, network, DNS, load balancer and web filter, resource, operating system and application logs
- Why each source is collected and the use cases it supports, such as investigation, alerting or compliance
- Where each source is stored and in which account
- Retention period and lifecycle rule for each source, and the requirement behind it
- Split between logs kept readily searchable and logs archived
- Who can read, query, change or delete the logs
- How log integrity is protected and checked
- Querying and alerting tools used for each source
- Accounts, Regions and workloads covered, and known gaps
- Date of the last review and who approved the log scope
What good looks like
- Coverage is stated per account and workload, with gaps listed
- Every log source has a stated reason and retention period
- Retention reflects legal, regulatory and business requirements, not defaults
- Access to logs is restricted and write or delete access is tightly limited
- Integrity is checked routinely, not only after an incident
- Logging is enabled by code or policy so new accounts are covered automatically
Not good enough
- Logs kept indefinitely, or deleted too soon
- Everybody can read or alter the logs
- Every type of log stored just in case
- Logging switched on by hand, account by account
- Log integrity checked only when something goes wrong
- Log sources known only to the team that set them up
- Review:
- Check coverage continuously through automated configuration checks, and review the register when workloads, accounts or obligations change and at least annually.
- Expected by:
- SEC06-BP03
- EVD-SEC-020Core
Security Remediation Rules & Outcome Register
Demonstrate that non-compliant resources are detected and fixed promptly and consistently, that automation is tested and overseen, and that outcomes are reviewed.
Must contain
- Configuration standards or control objectives the rules enforce
- Detection source for each rule
- Remediation for each rule, and whether it is defined as code
- Whether each remediation is manual or automatic, and why
- Trigger mechanism for each remediation
- Identity and permissions used to remediate, scoped to least privilege
- Testing and approval record before a remediation is enabled automatically
- Oversight arrangements: notifications, human override and rollback
- Log of actions taken and outcomes, and how they are reviewed
- Situations needing human judgement with no automated remediation, and who handles them
What good looks like
- Each rule traces to a stated configuration standard
- Remediations are defined as code and version controlled
- Automatic remediations have been tested and can be stopped or reversed
- Remediation identities have only the permissions they need
- Outcomes are recorded and reviewed
- Resource owners are told when their resource is changed
Not good enough
- Automation enabled without testing
- Fully automatic remediation with no way for people to step in
- Remediation identities with broad permissions
- Remediation treated as the whole response rather than one part of incident response
- No record of what automation changed
- Resource owners not told about changes
- Review:
- Review outcomes continuously, and review the rules and remediations when standards, tools or workloads change and at least annually.
- Expected by:
- SEC06-BP01, SEC06-BP05
- EVD-ARCH-005Supporting
Architecture / Design Decision Record
Provide traceable evidence that significant technical decisions were deliberate, appropriately challenged and aligned with business, risk and engineering considerations rather than being undocumented implementation choices.
Must contain
- Decision title, date, status and decision owner
- Problem, opportunity or context that required a decision
- Relevant business, technical, operational, security or regulatory objectives and constraints
- Options or alternatives genuinely considered
- Evaluation criteria and material trade-offs
- Decision and rationale
- Expected benefits and positive consequences
- Risks, disadvantages, technical debt and mitigation where material
- Affected systems, services or stakeholders
- Follow-up actions and owners where required
- Approval, acceptance or decision authority where relevant
- Review trigger/date and links to superseding or related decisions
What good looks like
- The decision is specific enough that a reviewer can tell what changed or was chosen
- Alternatives are plausible options that were actually considered, not straw-man choices added after the fact
- The rationale connects evidence and evaluation criteria to the final decision
- Trade-offs include material cost, performance, reliability, security, operational and organisational consequences where relevant
- Known risks and technical debt remain visible and have mitigation or explicit acceptance
- The record identifies the person or forum with authority to make or accept the decision
- Status and supersession are maintained so obsolete decisions are not mistaken for current direction
- Supporting evidence such as performance data, cost analysis, risk analysis or diagrams is linked when it materially influenced the decision
Not good enough
- Recording only the final choice with no context or rationale
- Listing alternatives without showing how they were evaluated
- Using a decision record to retrospectively justify a decision that had already been made without challenge
- Treating every low-level implementation choice as a formal architecture decision
- Omitting known risks, disadvantages or dissenting stakeholder concerns
- No named decision owner or approval authority
- Never updating a record when the decision is superseded
- Copying a generic template without evidence specific to the actual decision
- Produced by:
- Architect,Service Owner,Team Lead / Manager
- Reviewed by:
- Technology Executive,Risk / Compliance / Governance
- Review:
- Create when a material decision is made. Update status when accepted, rejected or superseded, and revisit when key assumptions, constraints, risks or business objectives materially change.
- Expected by:
- SEC06-BP04
- EVD-SEC-015Supporting
Permission Guardrail Register
Demonstrate that the maximum permissions available to identities are deliberately limited in layers, so undesired access cannot be granted even when an individual permission policy would allow it.
Must contain
- Account and organisational unit structure the guardrails attach to
- Each guardrail, its layer, its purpose and where it is applied
- Whether the approach is an allow list or a deny list, and why
- Which accounts, principals and resources are not covered, and the compensating controls
- Permissions boundaries applied to roles that workload teams use to manage their own permissions
- Resource and trust policy conditions that restrict who can access or assume
- Approach for temporary elevated access and privileged actions
- Approved exceptions with owner, rationale and review date
- How guardrail changes are tested before they are applied
- Last reviewed date and owner
What good looks like
- Workloads and environments are isolated in separate accounts before other guardrails are layered on
- Broad guardrails sit near the organisation root and stricter ones nearer individual accounts
- The register states what the guardrails do not cover
- Delegated permission management is capped by boundaries
- Exceptions are visible and time-bounded
- Changes are tested before they reach production accounts
Not good enough
- Member accounts created without organisation-level restrictions on their root credentials
- Least privilege applied to permissions, but no cap on what can be granted
- Relying on implicit deny, trusting that no policy will explicitly allow something unwanted
- Several environments in one account, separated only by tags, networks or resource policies
- Running workloads in the organisation management account
- Review:
- Review after material changes to the account structure, organisation policies or compliance obligations, and periodically against deployed policies.
- Expected by:
- SEC06-BP03
Cadence or trigger
When this is exercised
Guide interpretation — proposed by the Well-Architected Guide, not taken from the AWS framework.
Monthly review of vulnerability findings and patch status, plus on every new base image.
What should trigger a fresh look
- A new base image or runtime is introduced.
- A critical vulnerability is published for software in use.
- Interactive access to production is granted outside the normal route.
Escalation
Where it goes when it fails
Guide interpretation — proposed by the Well-Architected Guide, not taken from the AWS framework.
- A critical vulnerability left unpatched beyond the agreed time would be escalated to the security leader and service owner.
Organisation context
How this is normally arranged
A reference pattern for comparison, not a target structure.
Guide interpretation — proposed by the Well-Architected Guide, not taken from the AWS framework.
In a larger organisation
Usually split across several named functions.
- A platform team publishes hardened images and patch reports per account.
- Interactive access is removed by default and granted only through an audited route.
In a smaller organisation
Usually combined into a small number of people.
- Using managed services and a single approved image is a legitimate way to reduce what has to be patched.
The specialist job titles are not the point. What matters is that the responsibility is covered and someone answers for it.
Common ownership gaps
Patterns worth checking for
Where ownership usually breaks down, so you can test whether it holds here.
Read-across patterns, not findings about your organisation. Nothing on this page is recorded.
No accountable owner named
Several teams contribute, but nobody would commonly be expected to answer for the outcome when it is questioned.
Responsible for the work, but without decision authority
The team doing the work cannot make the call it depends on, so decisions typically stall or are made informally elsewhere.
An architect carrying business risk implicitly
A design trade-off quietly absorbs availability, recovery or spend exposure that would normally require acceptance by the appropriate business or service risk owner.
The specialist title is absent, but the responsibility still exists
There is no dedicated function for this. That is not a gap in itself — the question is whether the responsibility is covered and someone answers for it.
Evidence exists, but ownership of it is stale
A document is in place and nobody currently named is maintaining it, so it is typically out of date by the time it is relied on.
No independent challenge
The people doing the work are also the only people reviewing it, so weak assumptions usually go untested.
Signs the evidence is thin
- Engineers routinely log in to production servers to make changes.
- No list of approved base images.
- A wiki page describes the baseline but teams implement it manually
- A central security team deploys every control by request
- Templates exist but have no automated security or policy tests
- Workload teams fork templates and cannot consume upstream security fixes
- Baseline success is measured by template deployment, not resulting control conformance
- Emergency manual changes are never reconciled back into code
Framework traceability
The AWS practices behind this responsibility
Secondary detail: useful for auditors and architects, not needed to work out ownership.
- SEC06-BP01SEC6
Perform vulnerability management
- SEC06-BP02SEC6
Provision compute from hardened images
- SEC06-BP03SEC6
Reduce manual management and interactive access
- SEC06-BP04SEC6
Validate software integrity
- SEC06-BP05SEC6
Automate compute protection