Responsibility profile

Evaluate new services and operating approaches

Own a recurring workload review that tests current design against new services and current usage.

Worked example, not your assessment. The confidence states in this journey are a worked example. No evidence from your organisation has been reviewed, and nothing here is saved.

Outcome and responsibility

The estate does not quietly drift onto outdated, more expensive designs while better options exist.

Own a recurring workload review that tests current design against new services and current usage.

Confidence: Stale (example)Highest risk: High11 evidence records5 framework practices

Illustrative issue: A review process exists on paper but the last recorded review is over a year old.

Who should own this

Reference accountability mapping

Named as capabilities, not as job titles that must exist in your structure.

In a large enterprise

  • Reviews are scheduled per workload with an owner and a recorded outcome.
  • New-service evaluation feeds the architecture decision record set.

In a small organisation

  • One annual review of the whole estate with a short written outcome is proportionate.

These are reference patterns. No specialist job title has to exist: what matters is that the capability is named and someone answers for it.

Execution

What is actually done, and by whom

Published responsibilities from the practices behind this group.

  • responsible

    Identify cost-relevant provider opportunities

    Monitor service/pricing updates and assess potential financial significance.

  • responsible

    Assess technical applicability and trade-offs

    Evaluate fit, migration effort, architecture implications and operational consequences of relevant options.

  • accountable

    Own the workload adoption decision

    Prioritise material opportunities in the context of workload/customer outcomes and ensure realised results are reviewed.

  • accountable

    Own usage assumptions

    Validate business demand scenarios and material changes in expected workload usage.

  • responsible

    Model cost over usage scenarios

    Build and maintain cost/TCO projections for relevant demand levels.

  • responsible

    Identify architecture crossover points

    Determine when changing usage makes a different service or architecture economically preferable.

  • responsible

    Implement metric-driven resource automation

    Configure and maintain scaling, tiering or automatic selection policies and limits.

  • responsible

    Operate and validate the automation

    Monitor policy behavior, failures, saturation and manual override/fallback routes.

  • accountable

    Own service outcome and bounds

    Ensure cost automation does not compromise workload performance or resilience objectives.

  • accountable

    Own workload review cadence

    Ensure the workload is reviewed regularly and relevant opportunities are dispositioned.

  • responsible

    Evaluate architecture options

    Assess new services and features against current design, constraints and quality attributes.

  • responsible

    Evaluate cost impact

    Quantify material cost, pricing and commitment implications.

  • accountable

    Ensure reviews happen

    Own the review calendar, decisions and follow-through for the workload.

  • responsible

    Provide current cost analysis

    Bring current spend, unit cost, anomalies and opportunity evidence into the review.

  • responsible

    Assess architecture implications

    Evaluate whether new options improve the workload without unacceptable trade-offs.

Decision rights and risk acceptance

Who decides, and who may accept the risk

Guide interpretation — proposed by the Well-Architected Guide, not taken from the AWS framework.

Decision rights

  • Adopting a new service remains an architecture decision, not a procurement or tooling report.
  • The service owner decides whether an identified opportunity is taken, deferred or rejected.

Risk acceptance

Staying on a known-more-expensive design is acceptable when the reason and revisit date are recorded.

Evidence and confidence

What evidence should exist, and what good looks like

Records published in the evidence library. Confidence values are illustrative examples only.

  • EVD-COST-004CoreConfidence: Not assessed

    Cost Optimization Performance & Exception Report

    Demonstrate that cloud cost is reported and monitored proactively and that alerts, anomalies and negative trends lead to owned action rather than passive dashboard viewing.

    Must contain

    • Reporting period and scope
    • Budget/forecast versus actual
    • Top cost drivers and material changes
    • Cost/usage trends
    • Anomaly/threshold breaches
    • Alert date, threshold and recipients
    • Root cause or explanation
    • Optimisation opportunities
    • Named action owners and dates
    • Status/closure evidence
    • Positive trends or reusable savings patterns
    • Escalations requiring management decision

    What good looks like

    • Data is available at a useful workload/cost-driver granularity
    • Exceptions are tied to targets rather than subjective surprise
    • Alert routing has accountable recipients
    • Material anomalies have explanation and closure
    • Reports distinguish one-off variance from structural trend
    • Actions are tracked through to measured outcome

    Not good enough

    • Dashboard exists but nobody reviews it
    • Alerts go to a shared mailbox with no owner
    • Every cost increase is treated as waste
    • Budget is the only comparison point
    • Optimisation recommendations are listed but never prioritised or closed
    • Positive efficiency patterns are not shared
    Review:
    Daily to monthly depending on scale and volatility; management reporting should follow the established CFM cadence.
    Expected by:
    COST10-BP02
  • EVD-COST-005CoreConfidence: Not assessed

    Cost Optimization Opportunity & Service Review Log

    Demonstrate that relevant service and pricing changes are reviewed deliberately and converted into evidence-based adoption, rejection or follow-up decisions.

    Must contain

    • Review date and source
    • Service/feature/price change
    • Potentially affected workload/component
    • Expected cost impact
    • Technical applicability
    • Migration/adoption effort
    • Performance/reliability/security trade-offs
    • Decision: adopt / investigate / reject / defer
    • Rationale
    • Owner and next action
    • Link to option evaluation/ADR where material
    • Revisit trigger/date

    What good looks like

    • Only relevant changes are assessed in depth
    • Cost opportunity is considered with technical/customer impact
    • Rejections and deferrals preserve rationale
    • Material opportunities link to architecture evaluation
    • Review cadence is defined and evidenced
    • Closed opportunities show realised rather than theoretical benefit where possible

    Not good enough

    • Every AWS announcement becomes a backlog item
    • Newer service is assumed cheaper or better
    • Price reductions are not revisited against prior rejected options
    • Provider recommendation is accepted without workload analysis
    • Opportunities are logged but never decided
    • Savings estimate ignores migration and operating cost
    Review:
    Review provider/service/pricing updates on a defined cadence and when material workload or market changes occur.
    Expected by:
    COST01-BP07, COST10-BP01, COST10-BP02
  • EVD-ARCH-005SupportingConfidence: Not assessed

    Architecture / Design Decision Record

    Provide traceable evidence that significant technical decisions were deliberate, appropriately challenged and aligned with business, risk and engineering considerations rather than being undocumented implementation choices.

    Must contain

    • Decision title, date, status and decision owner
    • Problem, opportunity or context that required a decision
    • Relevant business, technical, operational, security or regulatory objectives and constraints
    • Options or alternatives genuinely considered
    • Evaluation criteria and material trade-offs
    • Decision and rationale
    • Expected benefits and positive consequences
    • Risks, disadvantages, technical debt and mitigation where material
    • Affected systems, services or stakeholders
    • Follow-up actions and owners where required
    • Approval, acceptance or decision authority where relevant
    • Review trigger/date and links to superseding or related decisions

    What good looks like

    • The decision is specific enough that a reviewer can tell what changed or was chosen
    • Alternatives are plausible options that were actually considered, not straw-man choices added after the fact
    • The rationale connects evidence and evaluation criteria to the final decision
    • Trade-offs include material cost, performance, reliability, security, operational and organisational consequences where relevant
    • Known risks and technical debt remain visible and have mitigation or explicit acceptance
    • The record identifies the person or forum with authority to make or accept the decision
    • Status and supersession are maintained so obsolete decisions are not mistaken for current direction
    • Supporting evidence such as performance data, cost analysis, risk analysis or diagrams is linked when it materially influenced the decision

    Not good enough

    • Recording only the final choice with no context or rationale
    • Listing alternatives without showing how they were evaluated
    • Using a decision record to retrospectively justify a decision that had already been made without challenge
    • Treating every low-level implementation choice as a formal architecture decision
    • Omitting known risks, disadvantages or dissenting stakeholder concerns
    • No named decision owner or approval authority
    • Never updating a record when the decision is superseded
    • Copying a generic template without evidence specific to the actual decision
    Review:
    Create when a material decision is made. Update status when accepted, rejected or superseded, and revisit when key assumptions, constraints, risks or business objectives materially change.
    Expected by:
    COST01-BP07, COST10-BP01
  • EVD-COST-020CoreConfidence: Not assessed

    Workload Component Cost / TCO Analysis

    Demonstrate that material workload components have been analyzed proportionately and that service-selection decisions consider total organizational cost rather than provider price alone.

    Must contain

    • Component/service scope
    • Current architecture/service option
    • Current cost baseline
    • Projected usage levels
    • Projected cost by scenario
    • Operational/management effort
    • Licensing/support costs
    • Migration/change effort where relevant
    • Alternative service/component options
    • TCO comparison
    • Business/architecture constraints
    • Expected benefit and payback
    • Analysis effort/materiality rationale
    • Recommendation and review trigger

    What good looks like

    • All material components are covered
    • Analysis effort scales with potential benefit
    • TCO includes operational and management effort
    • Projected usage is considered rather than today's load only
    • Managed, self-managed and alternative architecture options are considered where relevant
    • Recommendations are linked to organization priorities
    • Assumptions and uncertainty are explicit

    Not good enough

    • Only the top three line items are analyzed
    • Price-per-hour is treated as TCO
    • A day of analysis is spent to save negligible lifetime cost
    • Current usage is assumed to remain constant indefinitely
    • Managed services are rejected because unit price is higher without valuing operations effort
    • Potential savings are quoted without migration/change cost
    Review:
    Review high-cost/material components at least annually and when usage, pricing, architecture or service options change materially.
    Expected by:
    COST05-BP06, COST10-BP01
  • EVD-COST-023CoreConfidence: Not assessed

    Metric-Driven Resource Scaling Control Baseline

    Demonstrate that automated resource adjustment is based on meaningful workload signals and operates within safe, observable limits.

    Must contain

    • Resource/workload scope
    • Input metrics and source
    • Scaling or selection policy
    • Thresholds and evaluation windows
    • Minimum and maximum capacity
    • Cooldown/stabilization controls
    • Failure and fallback behavior
    • Cost and performance objectives
    • Testing/validation evidence
    • Alerting and owner
    • Change history and review trigger

    What good looks like

    • Metrics reflect customer/workload demand rather than a convenient proxy only
    • Thresholds and time windows are explicit
    • Minimum/maximum bounds prevent unsafe behavior
    • Scale-out and scale-in behavior are tested
    • Automation is observable and owned
    • Cost savings do not compromise performance or resilience targets

    Not good enough

    • Autoscaling exists but no one can explain the thresholds
    • CPU alone is used for a memory- or queue-bound workload
    • Scale-in is untested
    • No minimum or maximum bounds exist
    • Automation failures are silent
    • Policies remain unchanged after workload behavior changes
    Review:
    Review after material workload changes, scaling incidents, threshold changes or service/platform changes, and at least annually.
    Expected by:
    COST06-BP03
  • EVD-ARCH-009SupportingConfidence: Not assessed

    Architecture Option Evaluation

    Demonstrate that material architecture choices considered credible alternatives and relevant external/internal guidance rather than being selected through familiarity, assumption or vendor default.

    Must contain

    • Decision/evaluation scope and workload context
    • Business, customer and workload requirements relevant to the choice
    • Viable services, configurations or architecture patterns considered
    • Authoritative provider, partner, internal or industry guidance reviewed
    • Evaluation criteria covering performance and relevant cost, reliability, security and operational factors
    • Customer/user impact of material trade-offs
    • Assumptions and constraints
    • Representative measurements, experiments, benchmarks, operating evidence or credible external evidence used
    • Option-by-option findings and material disadvantages
    • Recommendation and rationale
    • Open uncertainties, conditions or follow-up actions
    • Link to the durable Architecture / Design Decision Record where a material decision is made
    • Review trigger or conditions that would cause reassessment

    What good looks like

    • Alternatives are genuinely viable rather than straw-man comparisons
    • Evaluation criteria are defined before the preferred option is selected
    • Provider guidance is interpreted in workload context rather than followed blindly
    • Customer impact and cross-pillar trade-offs are explicit
    • Evidence is proportionate to uncertainty and materiality
    • Assumptions and unknowns are visible
    • The chosen option can be traced to a durable decision record
    • The evaluation can be revisited when new services or evidence emerge

    Not good enough

    • The current technology is treated as the only option because the team already knows it
    • A provider reference architecture is copied without validating workload fit
    • All new services are assumed better because they are newer
    • Only performance improvement is recorded while cost, consistency, reliability or customer impact is ignored
    • The preferred option is selected before evaluation criteria are written
    • A proof of concept produces measurements but no documented decision
    • One benchmark number is used without representative workload context
    • The evaluation is never revisited after material provider or workload change
    Review:
    Create or refresh for material architecture choices and revisit when requirements, provider capabilities, costs or operating evidence materially change.
    Expected by:
    COST01-BP07, COST10-BP01
  • EVD-COST-001SupportingConfidence: Not assessed

    Architecture Cost & Efficiency Assessment

    Demonstrate that architecture decisions consider total cloud cost and resource efficiency explicitly rather than treating cost as an after-the-fact optimisation exercise.

    Must contain

    • Workload/service scope and business owner
    • Cost objective, budget constraint or economic guardrail relevant to the decision
    • Current or forecast primary cost drivers
    • Workload demand/usage assumptions
    • Candidate resource/service architecture options
    • Pricing model and commitment assumptions where relevant
    • Estimated cost for credible options using a documented basis
    • Resource-efficiency considerations such as right-sizing, elasticity and storage lifecycle
    • Operational/support/licensing cost where material
    • Performance, reliability or customer trade-offs associated with cost choices
    • Actual cost/utilisation evidence where the workload exists
    • Cost anomalies or optimisation opportunities identified
    • Decision/recommendation and link to architecture decision where material
    • Review cadence or trigger

    What good looks like

    • Cost objectives are workload-specific rather than generic 'reduce cost' statements
    • Cost estimates state assumptions and usage profile
    • Architecture options compare total cost rather than unit price alone
    • Performance and reliability consequences of cost choices are explicit
    • Actual spend and utilisation are compared with assumptions after implementation
    • Elasticity and managed-service operating effort are considered where material
    • FinOps and architecture evidence use a consistent workload scope
    • Significant changes can be traced to a decision and measurable outcome

    Not good enough

    • Architecture is chosen first and cost is reviewed only after deployment
    • Lowest unit price is assumed to mean lowest total cost
    • Oversized resources are accepted as a permanent safety margin
    • Reserved/committed pricing is used without understanding utilisation or lock-in
    • Cost reduction is pursued without measuring performance or customer impact
    • Licensing and operational effort are omitted from option comparison
    • Budgets exist but do not influence technical decisions
    • Cost tools produce dashboards but no owned architecture actions
    Review:
    Review for material architecture or pricing changes, when budgets/forecasts change materially, and periodically for cost/performance optimisation opportunities.
    Expected by:
    COST05-BP06
  • EVD-COST-006SupportingConfidence: Not assessed

    Cost Optimization Value Realization Report

    Demonstrate that cost optimisation is evaluated by business value and return rather than by gross cost reduction alone.

    Must contain

    • Initiative and scope
    • Pre-change cost baseline
    • Expected business/workload output baseline
    • Implementation cost and effort
    • Expected savings/avoidance/value
    • Realised cost after change
    • Realised saving/avoidance
    • Unit cost or cost-per-outcome where meaningful
    • Performance/reliability/customer impact
    • Non-financial benefits
    • ROI/payback or equivalent measure where useful
    • Method/assumptions
    • Owner and review period
    • Lessons/reinvestment or next action

    What good looks like

    • Baseline is comparable with post-change outcome
    • Savings are realised, not only theoretical recommendations
    • Implementation cost/effort is included
    • Workload output or business value is preserved or improved
    • Avoidance and cash savings are distinguished where material
    • Metrics can be explained to finance and technology stakeholders

    Not good enough

    • Every lower invoice is claimed as optimisation benefit
    • Savings are counted twice across initiatives
    • Engineering effort is treated as free
    • Cost is reduced by degrading required performance or reliability
    • Projected savings are reported as realised
    • No baseline or method exists
    Review:
    Complete after material optimisation initiatives and aggregate on the organisation's normal CFM/value reporting cadence.
    Expected by:
    COST10-BP02
  • EVD-COST-012SupportingConfidence: Not assessed

    Cost Management Data & Tooling Baseline

    Demonstrate that sufficiently detailed cost and usage data is available, retained, accessible and supported by configured billing/cost-management tooling for analysis, forecasting, alerting and optimization.

    Must contain

    • Cost and usage data sources
    • Data granularity and update frequency
    • Retention period and historical coverage
    • Account/workload scope covered
    • Access roles and permissions
    • Billing/cost-management tools configured
    • Forecasting, budget and anomaly/alert integrations
    • Optimization/recommendation features in use
    • Export/API/integration dependencies
    • Known gaps or blind spots
    • Owner and review cadence

    What good looks like

    • Data granularity matches the decisions teams need to make
    • Financial and technical users can access appropriate views
    • Historical data supports trend and forecast analysis
    • Tool configuration is documented rather than dependent on one administrator
    • Alerts and integrations have named owners
    • Known coverage limitations are explicit

    Not good enough

    • Only monthly invoice totals are available
    • Cost tools exist but workload owners cannot access them
    • Alerts fire to unowned mailboxes
    • Historical cost data is not retained long enough to compare trends
    • Multiple tools show conflicting allocation because configuration is unmanaged
    Review:
    Review quarterly and whenever billing architecture, account structure or major cost-management tooling changes.
    Expected by:
    COST10-BP02
  • EVD-COST-015SupportingConfidence: Not assessed

    Workload Business Output Metric Catalogue

    Demonstrate that each material workload has a small set of business or customer output metrics that can be combined with cost to assess efficiency rather than spend alone.

    Must contain

    • Workload/service scope
    • Business output metric name
    • Definition/formula
    • Business meaning
    • Unit of measure
    • Data source
    • Aggregation period
    • Owner
    • Quality/availability expectations
    • Known caveats
    • Version/change history

    What good looks like

    • Metrics represent delivered workload output or demand
    • Definitions are stable and reproducible
    • A small set is chosen rather than every available telemetry signal
    • Data quality is sufficient for financial analysis
    • Owners understand how metric changes affect interpretation

    Not good enough

    • Infrastructure utilization is presented as the only business output metric
    • Hundreds of metrics are collected with no prioritization
    • Metric definitions change silently
    • Business output is manually entered once per quarter while cost is hourly
    • The chosen metric rewards behavior that harms customer value
    Review:
    Review quarterly and when workload purpose, customer behavior or business process materially changes.
    Expected by:
    COST05-BP06, COST06-BP03
  • EVD-COST-022SupportingConfidence: Not assessed

    Resource Sizing & Selection Analysis

    Demonstrate that resource choices are based on workload evidence rather than defaults, guesswork or static lift-and-shift assumptions.

    Must contain

    • Workload/component scope
    • Business and performance requirements
    • Observed or forecast workload characteristics
    • CPU, memory, storage, throughput and network requirements where relevant
    • Historical utilization or benchmark data
    • Candidate resource types and sizes
    • Quantity/capacity assumptions
    • Cost comparison
    • Performance headroom and resilience constraints
    • Selected option and rationale
    • Review trigger

    What good looks like

    • Selection is traceable to workload data
    • Peak and cyclic demand are considered rather than averages alone
    • Resource characteristics match the workload bottleneck
    • Cost and performance are evaluated together
    • Headroom is explicit rather than accidental overprovisioning
    • The analysis can be repeated when workload behavior changes

    Not good enough

    • Selecting provider defaults without workload evidence
    • Sizing from average utilization only
    • Copying on-premises capacity directly into cloud resources
    • Ignoring memory, storage or network constraints
    • Treating maximum size as a substitute for resilience
    • Keeping the original size indefinitely after deployment
    Review:
    Review when workload demand, performance requirements, service options or observed utilization change materially, and at least annually for material workloads.
    Expected by:
    COST06-BP03

Editable templates for these records are planned in the Cloud Cost Evidence & Assurance Pack (planned £99)

Challenge and assurance

Questions that test whether this is real

Ask these in the room

  • Which authoritative provider or expert sources do we review for cost-relevant service and pricing changes, and how often?
  • Which recent service or pricing change could materially affect one of our largest workload cost drivers?
  • What apparently cheaper option did we reject because migration, performance, reliability or operating trade-offs outweighed the saving?
  • For an adopted cost opportunity, what evidence shows the projected saving was actually realised?
  • What realistic usage scenarios have been modeled for the material components of this workload?
  • At what usage level does a different service, configuration or architecture become economically preferable?
  • Are demand assumptions linked to business or workload output rather than infrastructure utilization alone?
  • How often are forecast usage and cost assumptions compared with actual outcomes?
  • Which metric is authoritative for scaling demand and why?
  • Can you show a tested scale-out, scale-in and failure scenario?
  • What prevents oscillation, unsafe scale-in or runaway scale-out?
  • How much eligible resource cost is currently governed by automation?

Measurements published for these practices

  • Review cadence adherence.
  • Number/value of relevant cost opportunities identified.
  • Age of undecided material opportunities.
  • Projected versus realised savings for adopted opportunities.
  • Percentage of material service-release decisions with recorded rationale.
  • Percentage of material components with current usage-scenario cost analysis.
  • Forecast-versus-actual usage variance.
  • Forecast-versus-actual cost variance.

Cadence and escalation

When this is exercised, and where it goes when it fails

Guide interpretation — proposed by the Well-Architected Guide, not taken from the AWS framework.

Cadence or trigger

Scheduled workload review at least annually; opportunity log reviewed quarterly.

Escalation

  • A workload with no completed review inside the agreed period is escalated to the technology executive.

Framework traceability

The AWS practices behind this responsibility

Secondary detail: useful for auditors and architects, not needed to act.

  • COST01-BP07COST1

    Keep up-to-date with new service releases

    Review relevant provider service, feature, Region and pricing changes on a defined cadence and assess whether they can improve workload cost efficiency. New does not mean better: material opportunities should be evaluated against migration effort, operating cost, performance, reliability, security and business constraints, with adoption or rejection decisions preserved.

  • COST05-BP06COST5

    Perform cost analysis for different usage over time

    Evaluate how component and workload cost changes across realistic usage scenarios over time. Use forecast demand, business-output metrics and total cost assumptions to identify when a different service, configuration or architecture becomes economically preferable.

  • COST06-BP03COST6

    Select resource type, size, and number automatically based on metrics

    Use live workload metrics to drive automatic scaling, tiering or resource-selection changes where frequent adjustment is beneficial. Automation must have meaningful signals, tested bounds, failure handling and operational ownership.

  • COST10-BP01COST10

    Develop a workload review process

    Establish an owned, recurring process to evaluate new services, features and pricing options against workload requirements, architecture and cost outcomes. Turn relevant findings into decisions and tracked optimization actions.

  • COST10-BP02COST10

    Review and analyze this workload regularly

    Perform the workload review on its agreed cadence using current cost, usage, architecture and service information. Prioritize material opportunities, make decisions, and verify that implemented changes deliver the expected outcome.