EVD-ARCH-001Core
Demonstrate that workload boundaries have been chosen deliberately to support business cohesion, reliability, independent change and scaling without creating unnecessary distributed-system complexity.
Must contain
- Workload scope and major business capabilities or domains
- Services/modules and the business/domain responsibility of each
- Named owning team or accountable service ownership where known
- Key dependencies and communication paths between boundaries
- Key data ownership/stores and material shared-data dependencies
- Criticality, availability, recovery or scaling differences where relevant
- Boundary rationale, including change-independence and failure-isolation considerations
- Known areas of high coupling, ambiguous ownership or transitional architecture
- Relationship to relevant architecture decisions and service contracts
- Last reviewed date and material change triggers
What good looks like
- Boundaries reflect meaningful business or reliability concerns rather than technical layers alone
- The model makes both intended separation and actual coupling visible
- Ownership is clear enough to understand who changes and operates each major boundary
- Data ownership and shared-data dependencies are explicit
- Critical services can be distinguished from lower-criticality capabilities
- The model is consistent with deployed reality rather than an aspirational target-state diagram only
- Important boundary choices can be traced to architecture decisions or migration plans
- The model can evolve incrementally as domains, teams and workload characteristics change
Not good enough
- Every deployable unit is treated as a separate business service
- UI, middleware and database layers are modelled as domain boundaries without business cohesion
- A large number of microservices share one mutable schema and coordinated releases
- The model shows boxes but omits ownership, dependencies and data boundaries
- A future-state diagram is presented as evidence of current architecture
- No distinction exists between temporary migration boundaries and intended long-term boundaries
- Architecture boundaries are never revisited after business or team changes
- Review:
- Review after material domain, service, ownership, data, scaling or resilience changes, and periodically where the workload continues to evolve.
- Expected by:
- REL03-BP01, REL03-BP02
EVD-ARCH-005Core
Provide traceable evidence that significant technical decisions were deliberate, appropriately challenged and aligned with business, risk and engineering considerations rather than being undocumented implementation choices.
Must contain
- Decision title, date, status and decision owner
- Problem, opportunity or context that required a decision
- Relevant business, technical, operational, security or regulatory objectives and constraints
- Options or alternatives genuinely considered
- Evaluation criteria and material trade-offs
- Decision and rationale
- Expected benefits and positive consequences
- Risks, disadvantages, technical debt and mitigation where material
- Affected systems, services or stakeholders
- Follow-up actions and owners where required
- Approval, acceptance or decision authority where relevant
- Review trigger/date and links to superseding or related decisions
What good looks like
- The decision is specific enough that a reviewer can tell what changed or was chosen
- Alternatives are plausible options that were actually considered, not straw-man choices added after the fact
- The rationale connects evidence and evaluation criteria to the final decision
- Trade-offs include material cost, performance, reliability, security, operational and organisational consequences where relevant
- Known risks and technical debt remain visible and have mitigation or explicit acceptance
- The record identifies the person or forum with authority to make or accept the decision
- Status and supersession are maintained so obsolete decisions are not mistaken for current direction
- Supporting evidence such as performance data, cost analysis, risk analysis or diagrams is linked when it materially influenced the decision
Not good enough
- Recording only the final choice with no context or rationale
- Listing alternatives without showing how they were evaluated
- Using a decision record to retrospectively justify a decision that had already been made without challenge
- Treating every low-level implementation choice as a formal architecture decision
- Omitting known risks, disadvantages or dissenting stakeholder concerns
- No named decision owner or approval authority
- Never updating a record when the decision is superseded
- Copying a generic template without evidence specific to the actual decision
- Review:
- Create when a material decision is made. Update status when accepted, rejected or superseded, and revisit when key assumptions, constraints, risks or business objectives materially change.
- Expected by:
- REL03-BP01
EVD-ARCH-008Core
Demonstrate that producers and consumers have an explicit shared interface definition that supports independent change without relying on undocumented implementation assumptions or accidental compatibility.
Must contain
- Contract identity, service/API name, owner and current version/status
- Intended consumers, scope and interface purpose
- Operations, endpoints, events or callable behaviours in scope
- Request/input schemas, constraints and required/optional fields
- Response/output schemas and semantic meaning
- Expected behaviour, state changes and material side effects
- Error model, error codes/conditions and retry expectations where relevant
- Authentication/authorisation and trust expectations where they form part of the interface
- Compatibility and versioning policy
- Deprecation, migration and support-window expectations
- Material reliability, timeout, idempotency or rate/usage expectations where consumers depend on them
- Machine-readable contract/specification where appropriate
- Verification or contract-test approach
- Change history and communication expectations for consumers
What good looks like
- The contract describes observable behaviour rather than internal implementation details
- Schemas and semantics are precise enough for consumers to integrate without undocumented assumptions
- Errors and exceptional behaviour are documented rather than only the happy path
- Compatibility/versioning rules make clear which changes are breaking and how they are introduced
- The contract is version controlled and can be traced to the currently supported interface
- Machine-readable specifications are used where they improve verification or client/tool interoperability
- Automated contract or compatibility checks verify that implementations match the declared interface where practical
- Consumer-impacting changes have a defined communication, migration and deprecation path
- Ownership is clear for resolving ambiguity and coordinating changes
Not good enough
- Documentation generated from implementation but never reviewed as a producer-consumer contract
- Only endpoint names are documented while schemas, semantics and errors remain implicit
- Breaking changes are released under the same contract/version with no migration path
- The contract embeds unnecessary implementation internals that prevent independent evolution
- Versioning exists in the URL or metadata but no compatibility policy defines what versions mean
- Consumers rely on behaviours not represented in the contract
- Contract tests validate examples only and miss meaningful compatibility or schema changes
- The published contract is stale compared with the deployed interface
- No named owner or change path exists when producers and consumers disagree about expected behaviour
- Review:
- Review whenever the interface, schemas, behaviour, compatibility policy or lifecycle materially changes, and keep the current contract version aligned with the deployed/supported interface.
- Expected by:
- REL03-BP03
EVD-ARCH-009Core
Demonstrate that material architecture choices considered credible alternatives and relevant external/internal guidance rather than being selected through familiarity, assumption or vendor default.
Must contain
- Decision/evaluation scope and workload context
- Business, customer and workload requirements relevant to the choice
- Viable services, configurations or architecture patterns considered
- Authoritative provider, partner, internal or industry guidance reviewed
- Evaluation criteria covering performance and relevant cost, reliability, security and operational factors
- Customer/user impact of material trade-offs
- Assumptions and constraints
- Representative measurements, experiments, benchmarks, operating evidence or credible external evidence used
- Option-by-option findings and material disadvantages
- Recommendation and rationale
- Open uncertainties, conditions or follow-up actions
- Link to the durable Architecture / Design Decision Record where a material decision is made
- Review trigger or conditions that would cause reassessment
What good looks like
- Alternatives are genuinely viable rather than straw-man comparisons
- Evaluation criteria are defined before the preferred option is selected
- Provider guidance is interpreted in workload context rather than followed blindly
- Customer impact and cross-pillar trade-offs are explicit
- Evidence is proportionate to uncertainty and materiality
- Assumptions and unknowns are visible
- The chosen option can be traced to a durable decision record
- The evaluation can be revisited when new services or evidence emerge
Not good enough
- The current technology is treated as the only option because the team already knows it
- A provider reference architecture is copied without validating workload fit
- All new services are assumed better because they are newer
- Only performance improvement is recorded while cost, consistency, reliability or customer impact is ignored
- The preferred option is selected before evaluation criteria are written
- A proof of concept produces measurements but no documented decision
- One benchmark number is used without representative workload context
- The evaluation is never revisited after material provider or workload change
- Review:
- Create or refresh for material architecture choices and revisit when requirements, provider capabilities, costs or operating evidence materially change.
- Expected by:
- COST05-BP03, COST05-BP05, COST06-BP04
EVD-COST-002Core
Demonstrate that cost optimization has explicit ownership and an embedded finance-technology operating model rather than depending on ad hoc individual effort.
Must contain
- Scope of the cloud financial management function
- Named owners and cross-functional membership
- Decision rights and responsibility boundaries
- Finance-technology-business meeting cadence
- Budget, forecast, anomaly and optimisation review touchpoints
- Cost-aware change/architecture/incident/process integration
- Escalation and exception path
- Role-specific cost awareness and training expectations
- Communication/reporting routes
- Success measures and review cadence
What good looks like
- Ownership is explicit and current
- Finance and technology share a common cost language and cadence
- The operating model connects to real organisational processes
- Teams can explain who acts on budget, anomaly and optimisation signals
- Training/enablement is role-specific rather than generic
- The model scales cost ownership into workload teams without removing central oversight
Not good enough
- A FinOps team exists only on an organisation chart
- Finance sees invoices after decisions are made
- Technology receives cost reports but has no action ownership
- Cost awareness is a one-off training course
- All cost approvals are centralised in a way that blocks normal cloud delivery
- No review cadence or escalation path exists
- Review:
- Review at least annually and when cloud scale, organisation structure or financial governance changes materially.
- Expected by:
- COST01-BP01, COST01-BP02, COST01-BP04, COST01-BP08
EVD-COST-003Core
Demonstrate that variable cloud consumption is planned and governed using dynamic budgets and forecasts tied to business drivers rather than static annual estimates.
Must contain
- Budget/forecast scope and period
- Cost dimensions and common cost language
- Historical baseline
- Trend-based assumptions
- Business-driver assumptions
- Pricing/commitment assumptions where material
- Forecast by relevant cost category
- Budget target and variance thresholds
- Actual-to-forecast comparison
- Variance explanation/root cause
- Named owners and review cadence
- Approved/recorded adjustments and rationale
What good looks like
- Assumptions are explicit and traceable
- Forecast granularity matches decision needs
- Business drivers and trend data are used appropriately
- Actuals are compared with forecast regularly
- Material variance leads to explanation and action
- Budget changes preserve rationale rather than silently resetting the baseline
Not good enough
- Annual budget copied forward unchanged
- Forecast equals budget with no independent assumptions
- Cloud cost forecast ignores business demand changes
- Variance is hidden by repeatedly rebasing the forecast
- Only total account spend is forecast when workload decisions require finer scope
- Forecast exists but no owner reviews accuracy
- Review:
- Review monthly or at the organisation's normal cloud-financial cadence, and refresh when business drivers or material pricing/usage assumptions change.
- Expected by:
- COST01-BP03, COST02-BP05
EVD-COST-004Core
Demonstrate that cloud cost is reported and monitored proactively and that alerts, anomalies and negative trends lead to owned action rather than passive dashboard viewing.
Must contain
- Reporting period and scope
- Budget/forecast versus actual
- Top cost drivers and material changes
- Cost/usage trends
- Anomaly/threshold breaches
- Alert date, threshold and recipients
- Root cause or explanation
- Optimisation opportunities
- Named action owners and dates
- Status/closure evidence
- Positive trends or reusable savings patterns
- Escalations requiring management decision
What good looks like
- Data is available at a useful workload/cost-driver granularity
- Exceptions are tied to targets rather than subjective surprise
- Alert routing has accountable recipients
- Material anomalies have explanation and closure
- Reports distinguish one-off variance from structural trend
- Actions are tracked through to measured outcome
Not good enough
- Dashboard exists but nobody reviews it
- Alerts go to a shared mailbox with no owner
- Every cost increase is treated as waste
- Budget is the only comparison point
- Optimisation recommendations are listed but never prioritised or closed
- Positive efficiency patterns are not shared
- Review:
- Daily to monthly depending on scale and volatility; management reporting should follow the established CFM cadence.
- Expected by:
- COST01-BP01, COST01-BP04, COST01-BP05, COST01-BP06, COST01-BP08, COST01-BP09, COST10-BP02
EVD-COST-005Core
Demonstrate that relevant service and pricing changes are reviewed deliberately and converted into evidence-based adoption, rejection or follow-up decisions.
Must contain
- Review date and source
- Service/feature/price change
- Potentially affected workload/component
- Expected cost impact
- Technical applicability
- Migration/adoption effort
- Performance/reliability/security trade-offs
- Decision: adopt / investigate / reject / defer
- Rationale
- Owner and next action
- Link to option evaluation/ADR where material
- Revisit trigger/date
What good looks like
- Only relevant changes are assessed in depth
- Cost opportunity is considered with technical/customer impact
- Rejections and deferrals preserve rationale
- Material opportunities link to architecture evaluation
- Review cadence is defined and evidenced
- Closed opportunities show realised rather than theoretical benefit where possible
Not good enough
- Every AWS announcement becomes a backlog item
- Newer service is assumed cheaper or better
- Price reductions are not revisited against prior rejected options
- Provider recommendation is accepted without workload analysis
- Opportunities are logged but never decided
- Savings estimate ignores migration and operating cost
- Review:
- Review provider/service/pricing updates on a defined cadence and when material workload or market changes occur.
- Expected by:
- COST01-BP07, COST10-BP01, COST10-BP02
EVD-COST-006Core
Demonstrate that cost optimisation is evaluated by business value and return rather than by gross cost reduction alone.
Must contain
- Initiative and scope
- Pre-change cost baseline
- Expected business/workload output baseline
- Implementation cost and effort
- Expected savings/avoidance/value
- Realised cost after change
- Realised saving/avoidance
- Unit cost or cost-per-outcome where meaningful
- Performance/reliability/customer impact
- Non-financial benefits
- ROI/payback or equivalent measure where useful
- Method/assumptions
- Owner and review period
- Lessons/reinvestment or next action
What good looks like
- Baseline is comparable with post-change outcome
- Savings are realised, not only theoretical recommendations
- Implementation cost/effort is included
- Workload output or business value is preserved or improved
- Avoidance and cash savings are distinguished where material
- Metrics can be explained to finance and technology stakeholders
Not good enough
- Every lower invoice is claimed as optimisation benefit
- Savings are counted twice across initiatives
- Engineering effort is treated as free
- Cost is reduced by degrading required performance or reliability
- Projected savings are reported as realised
- No baseline or method exists
- Review:
- Complete after material optimisation initiatives and aggregate on the organisation's normal CFM/value reporting cadence.
- Expected by:
- COST01-BP09, COST11-BP01
EVD-COST-007Core
Demonstrate that cloud-resource creation, modification, usage and decommissioning are governed by explicit organization requirements that include cost and usage expectations.
Must contain
- Scope and policy owner
- Cloud usage and cost principles
- Resource creation/modification/decommissioning rules
- Approved/limited services, regions or resource classes where applicable
- Ownership and cost-allocation requirements
- Required tagging/metadata expectations
- Exception process and authority
- Review cadence and version history
What good looks like
- Requirements are specific enough to implement and test
- Policy covers the full resource lifecycle
- Cost rules align with business and workload needs
- Exceptions are governed rather than informal
- Policy is reviewed when organization or provider conditions change
Not good enough
- A generic cloud policy contains no cost or lifecycle requirements
- Rules exist only as tribal knowledge
- Policy forbids innovation without an exception path
- Policy is never reconciled with implemented controls
- Review:
- At least annually and when organization structure, cloud strategy or major provider capabilities change.
- Expected by:
- COST02-BP01, COST02-BP04, COST02-BP05
EVD-COST-008Core
Demonstrate that cloud financial management has explicit, measurable cost and usage outcomes rather than an undefined objective to reduce spend.
Must contain
- Goal statement
- Metric/KPI definition
- Baseline
- Target value
- Target date
- Business outcome linkage
- Owner
- Measurement source
- Current status/trend
- Review cadence
What good looks like
- Targets are measurable and time-bound
- Cost and usage are considered together
- Metrics connect to business outcomes where possible
- Baselines and data sources are explicit
- Targets are reviewed as workload demand changes
Not good enough
- Only absolute spend reduction is measured
- Targets have no owner or deadline
- KPI definitions change without versioning
- Savings opportunities are counted as realized outcomes
- Review:
- Monthly or quarterly depending on cost materiality and workload volatility.
- Expected by:
- COST02-BP02
EVD-COST-009Core
Demonstrate that cloud accounts and organizational boundaries support cost ownership, allocation, governance and workload management.
Must contain
- Management/billing account boundary
- Organizational unit/account hierarchy
- Purpose and owner for each material account/group
- Workload/environment mapping
- Cost center/business-unit mapping
- Shared-service treatment
- Consolidated billing/allocation approach
- Naming and lifecycle rules
What good looks like
- Each account has an understood purpose and owner
- Structure supports both governance and cost attribution
- Shared costs have an explicit treatment
- Environment/workload boundaries are consistent
- Structure evolves deliberately rather than through account sprawl
Not good enough
- Accounts exist with no owner or purpose
- Account names are the only cost-allocation mechanism
- Shared services are silently charged to one team
- Security segmentation and cost allocation contradict one another
- Review:
- Review quarterly and when organization/workload ownership changes materially.
- Expected by:
- COST02-BP03
EVD-COST-010Core
Demonstrate that policy-defined cloud actions are assigned consistently to groups and roles rather than to individuals ad hoc.
Must contain
- Group/role name
- Business/technical purpose
- Permitted actions
- Restricted actions
- Environment/account scope
- Policy source
- Approval/assignment authority
- Review/recertification frequency
What good looks like
- Permissions are role-based rather than individually improvised
- Actions map back to policy requirements
- Privilege is proportionate to responsibility
- Environment/account scope is explicit
- Role assignments are periodically reviewed
Not good enough
- Named users receive permanent broad access
- Financial roles cannot view the data they are accountable for
- Developers can create unrestricted resources in all environments
- Role definitions exist but are not enforced in cloud IAM
- Review:
- Review at least quarterly and on material organization or responsibility changes.
- Expected by:
- COST02-BP04, COST02-BP05
EVD-COST-011Core
Demonstrate that projects, environments and material resource groups have active owners, lifecycle state and review/decommission triggers so obsolete spend is identified and removed.
Must contain
- Project/workload/environment identifier
- Business purpose
- Owner
- Lifecycle state
- Start date
- Expected end/review date
- Last reviewed date
- Current cost/usage where material
- Decommission/resize trigger
- Outstanding cleanup action and due date
What good looks like
- Lifecycle state reflects reality
- Owners are current
- Review dates are visible and enforced
- Pre-production and temporary environments have explicit expiry expectations
- Decommission actions are tracked to closure
Not good enough
- Development environments are treated as permanent by default
- Projects close but cloud resources remain unowned
- Last-reviewed dates are absent
- Lifecycle tags exist but nobody acts on them
- Review:
- Review monthly or quarterly depending on estate size and change rate.
- Expected by:
- COST02-BP06, COST04-BP01, COST04-BP02, COST04-BP03
EVD-COST-012Core
Demonstrate that sufficiently detailed cost and usage data is available, retained, accessible and supported by configured billing/cost-management tooling for analysis, forecasting, alerting and optimization.
Must contain
- Cost and usage data sources
- Data granularity and update frequency
- Retention period and historical coverage
- Account/workload scope covered
- Access roles and permissions
- Billing/cost-management tools configured
- Forecasting, budget and anomaly/alert integrations
- Optimization/recommendation features in use
- Export/API/integration dependencies
- Known gaps or blind spots
- Owner and review cadence
What good looks like
- Data granularity matches the decisions teams need to make
- Financial and technical users can access appropriate views
- Historical data supports trend and forecast analysis
- Tool configuration is documented rather than dependent on one administrator
- Alerts and integrations have named owners
- Known coverage limitations are explicit
Not good enough
- Only monthly invoice totals are available
- Cost tools exist but workload owners cannot access them
- Alerts fire to unowned mailboxes
- Historical cost data is not retained long enough to compare trends
- Multiple tools show conflicting allocation because configuration is unmanaged
- Review:
- Review quarterly and whenever billing architecture, account structure or major cost-management tooling changes.
- Expected by:
- COST03-BP01, COST03-BP05
EVD-COST-013Core
Demonstrate that organization and workload metadata is applied consistently enough to attribute cloud cost and usage to meaningful owners, environments and business categories.
Must contain
- Required metadata/tag keys
- Allowed values or value rules
- Purpose of each attribute
- Scope/resources to which each attribute applies
- Ownership for maintaining values
- Inheritance/defaulting rules
- Enforcement or validation mechanism
- Activation in billing/cost reporting where required
- Coverage percentage by attribute
- Invalid/missing-value exceptions
- Remediation owner and due date
- Review/version history
What good looks like
- Required attributes correspond to real allocation and decision needs
- Values are controlled enough for consistent reporting
- Coverage is measured rather than assumed
- Metadata is visible in cost reporting, not only on resources
- Exceptions are prioritized by spend/materiality
- The standard avoids excessive tag proliferation
Not good enough
- Dozens of required tags have no reporting use
- Free-text values fragment the same business category
- Resources are tagged but the tags are not enabled in cost reporting
- Coverage dashboards ignore untaggable/shared costs
- Missing tags have no remediation owner
- Review:
- Review monthly or quarterly depending on estate change rate and allocation requirements.
- Expected by:
- COST03-BP02, COST03-BP03
EVD-COST-014Core
Demonstrate that cloud spend is classified into organization-relevant categories such as business unit, cost center, workload, project, environment and shared service using explicit mapping rules.
Must contain
- Attribution category name
- Business meaning and owner
- Source field/account/tag/metric
- Mapping rule
- Treatment of shared/unallocated spend
- Hierarchy/roll-up rules
- Effective date/version
- Known exceptions
- Reconciliation method to billing total
What good looks like
- Categories reflect organization decisions, not just provider billing fields
- Mapping rules are deterministic and explainable
- Shared/unallocated cost has an explicit treatment
- Roll-ups reconcile to authoritative billing totals
- Taxonomy changes are versioned and communicated
Not good enough
- Reporting uses only account IDs or service names
- The same workload maps to different cost centers in different reports
- Shared cost is hidden in a miscellaneous bucket
- Categories change monthly without version control
- Allocated totals do not reconcile to billing
- Review:
- Review quarterly and after material organization, account-structure or allocation-model changes.
- Expected by:
- COST03-BP02, COST03-BP03, COST03-BP06
EVD-COST-015Core
Demonstrate that each material workload has a small set of business or customer output metrics that can be combined with cost to assess efficiency rather than spend alone.
Must contain
- Workload/service scope
- Business output metric name
- Definition/formula
- Business meaning
- Unit of measure
- Data source
- Aggregation period
- Owner
- Quality/availability expectations
- Known caveats
- Version/change history
What good looks like
- Metrics represent delivered workload output or demand
- Definitions are stable and reproducible
- A small set is chosen rather than every available telemetry signal
- Data quality is sufficient for financial analysis
- Owners understand how metric changes affect interpretation
Not good enough
- Infrastructure utilization is presented as the only business output metric
- Hundreds of metrics are collected with no prioritization
- Metric definitions change silently
- Business output is manually entered once per quarter while cost is hourly
- The chosen metric rewards behavior that harms customer value
- Review:
- Review quarterly and when workload purpose, customer behavior or business process materially changes.
- Expected by:
- COST03-BP04, COST09-BP01
EVD-COST-016Core
Demonstrate how workload cost is allocated against usage or business output metrics to calculate unit economics, efficiency trends and chargeback/showback where appropriate.
Must contain
- Workload/business scope
- Authoritative cost numerator
- Usage/business-output denominator
- Allocation treatment for shared costs
- Formula and unit
- Baseline/current/trend
- Data sources and frequency
- Known assumptions and limitations
- Owner
- Decision thresholds or review triggers
What good looks like
- Numerator and denominator cover the same scope/time period
- Shared-cost allocation is explicit
- The unit has a meaningful business or workload interpretation
- Trends can distinguish efficiency from demand growth
- Assumptions are visible and periodically reviewed
Not good enough
- Cost per transaction uses workload cost but company-wide transaction count
- Shared costs are excluded because allocation is difficult
- A falling unit cost is celebrated despite degraded service/customer outcome
- Unit economics are calculated once and never operationalized
- Chargeback precision is pursued beyond the quality of source data
- Review:
- Review monthly or quarterly depending on workload materiality, and after material architecture/allocation changes.
- Expected by:
- COST03-BP06
EVD-COST-017Core
Demonstrate that resource decommissioning is a repeatable, owned process and that identified resources are actually removed safely and completely.
Must contain
- Candidate resource/workload identifier and owner
- Reason/trigger for decommissioning
- Usage and dependency validation
- Business-owner confirmation
- Retention/compliance checks
- Backup/restore or recovery decision where required
- Infrastructure-as-code/configuration implications
- Access/DNS/monitoring/security/tooling cleanup steps
- Planned execution date and executor
- Actual completion date and outcome
- Residual resources or exceptions
- Post-decommission cost/usage verification
What good looks like
- Process covers dependent resources rather than only the obvious compute resource
- Business usage is verified before destructive action
- Retention and compliance obligations are checked explicitly
- Rollback/recovery needs are considered proportionately
- Execution evidence proves completion rather than approval only
- Residual cost and orphaned dependencies are checked after decommissioning
Not good enough
- A ticket is closed when the main instance is stopped but disks, snapshots, IPs, licenses or monitoring remain
- Resource deletion relies on one administrator's memory
- No business owner confirms that the resource is unused
- Backups are retained indefinitely without reason
- Decommissioning approvals exist but completion is not verified
- Review:
- Review the process at least annually and after material decommission failures; review execution records continuously as actions occur.
- Expected by:
- COST04-BP02, COST04-BP03, COST04-BP04
EVD-COST-018Core
Demonstrate that appropriate non-critical or unused resources can be reduced or removed automatically without compromising workload safety or business continuity.
Must contain
- Automation/control name
- Resource types and environments in scope
- Trigger metric/event/expiry condition
- Minimum observation or grace period
- Exclusions and protected resources
- Safety/health conditions
- Scale-in or deletion action
- Notification/escalation behavior
- Rollback/disable mechanism
- Non-production test evidence
- Production monitoring and audit trail
- Owner and review cadence
What good looks like
- Automation targets resources where termination is actually safe
- Triggers include a time/grace dimension where low usage can be normal
- Protected or critical resources are explicitly excluded
- Automation is tested before broad production use
- Failures and unexpected terminations are observable
- Control can be disabled or rolled back quickly
Not good enough
- Delete anything with zero CPU for five minutes
- Production and test resources share identical termination rules without justification
- Automation has no owner or audit trail
- Manual exceptions accumulate permanently
- Savings are measured but customer-impact risk is not
- Review:
- Review quarterly and after material incidents, workload architecture changes or provider capability changes.
- Expected by:
- COST04-BP04
EVD-COST-019Core
Demonstrate that service and architecture choices are evaluated against explicit organization/workload priorities rather than lowest price or team familiarity alone.
Must contain
- Workload/business outcome
- Cost objective or constraint
- Performance priority
- Reliability/availability priority
- Security/compliance constraints
- Operational-management preference
- Time-to-market constraint
- Relative priority or weighting
- Decision principles for acceptable trade-offs
- Stakeholders consulted
- Review trigger/cadence
What good looks like
- Priorities are workload-specific rather than generic corporate slogans
- Cost is balanced explicitly against other architecture qualities
- Constraints are measurable where possible
- Stakeholders from finance, product/service and technology contributed
- Trade-off rules are clear enough to guide component decisions
- Profile is revisited when usage, business priorities or risk changes
Not good enough
- Lowest cost is treated as the only objective
- Every pillar is marked equally critical with no prioritization
- Architecture teams infer business priorities without stakeholder input
- A budget is used as a substitute for service-selection criteria
- The profile is never updated after major workload change
- Review:
- Review at least annually and when business outcomes, risk appetite, workload demand or architecture strategy changes materially.
- Expected by:
- COST05-BP01, COST05-BP02, COST05-BP05, COST06-BP01
EVD-COST-020Core
Demonstrate that material workload components have been analyzed proportionately and that service-selection decisions consider total organizational cost rather than provider price alone.
Must contain
- Component/service scope
- Current architecture/service option
- Current cost baseline
- Projected usage levels
- Projected cost by scenario
- Operational/management effort
- Licensing/support costs
- Migration/change effort where relevant
- Alternative service/component options
- TCO comparison
- Business/architecture constraints
- Expected benefit and payback
- Analysis effort/materiality rationale
- Recommendation and review trigger
What good looks like
- All material components are covered
- Analysis effort scales with potential benefit
- TCO includes operational and management effort
- Projected usage is considered rather than today's load only
- Managed, self-managed and alternative architecture options are considered where relevant
- Recommendations are linked to organization priorities
- Assumptions and uncertainty are explicit
Not good enough
- Only the top three line items are analyzed
- Price-per-hour is treated as TCO
- A day of analysis is spent to save negligible lifetime cost
- Current usage is assumed to remain constant indefinitely
- Managed services are rejected because unit price is higher without valuing operations effort
- Potential savings are quoted without migration/change cost
- Review:
- Review high-cost/material components at least annually and when usage, pricing, architecture or service options change materially.
- Expected by:
- COST05-BP02, COST05-BP03, COST05-BP05, COST05-BP06, COST06-BP01, COST06-BP02, COST06-BP04, COST10-BP01
EVD-COST-021Core
Demonstrate that software licensing choices are economically justified and scale with delivered value rather than arbitrary infrastructure attributes where alternatives exist.
Must contain
- Software/product scope
- Business/technical requirement
- Current license model and metric
- Entitlement/contract assumptions
- Current license/support cost
- Projected cost by usage/scale scenario
- Open-source or lower-license alternatives
- Managed-service alternative where relevant
- Operational/support skill implications
- Migration/change cost
- Vendor lock-in/exit considerations
- Recommendation and rationale
- Renewal/review date
What good looks like
- License metric and scaling behavior are understood
- Entitlements are reconciled to actual use
- Open-source alternatives are evaluated on TCO, not license price alone
- Support/operations skill requirements are included
- Renewal and vendor pricing changes trigger review
- Recommendation is connected to workload priorities
Not good enough
- Open source is assumed free because license cost is zero
- Existing licenses are treated as sunk cost forever
- CPU/core-based licensing is ignored when autoscaling or instance size changes
- Support and specialist skills are omitted from TCO
- License renewal happens automatically without re-evaluation
- Review:
- Review before major renewals, material usage changes, vendor pricing changes and major architecture changes.
- Expected by:
- COST05-BP04
EVD-COST-022Core
Demonstrate that resource choices are based on workload evidence rather than defaults, guesswork or static lift-and-shift assumptions.
Must contain
- Workload/component scope
- Business and performance requirements
- Observed or forecast workload characteristics
- CPU, memory, storage, throughput and network requirements where relevant
- Historical utilization or benchmark data
- Candidate resource types and sizes
- Quantity/capacity assumptions
- Cost comparison
- Performance headroom and resilience constraints
- Selected option and rationale
- Review trigger
What good looks like
- Selection is traceable to workload data
- Peak and cyclic demand are considered rather than averages alone
- Resource characteristics match the workload bottleneck
- Cost and performance are evaluated together
- Headroom is explicit rather than accidental overprovisioning
- The analysis can be repeated when workload behavior changes
Not good enough
- Selecting provider defaults without workload evidence
- Sizing from average utilization only
- Copying on-premises capacity directly into cloud resources
- Ignoring memory, storage or network constraints
- Treating maximum size as a substitute for resilience
- Keeping the original size indefinitely after deployment
- Review:
- Review when workload demand, performance requirements, service options or observed utilization change materially, and at least annually for material workloads.
- Expected by:
- COST06-BP02, COST09-BP03
EVD-COST-023Core
Demonstrate that automated resource adjustment is based on meaningful workload signals and operates within safe, observable limits.
Must contain
- Resource/workload scope
- Input metrics and source
- Scaling or selection policy
- Thresholds and evaluation windows
- Minimum and maximum capacity
- Cooldown/stabilization controls
- Failure and fallback behavior
- Cost and performance objectives
- Testing/validation evidence
- Alerting and owner
- Change history and review trigger
What good looks like
- Metrics reflect customer/workload demand rather than a convenient proxy only
- Thresholds and time windows are explicit
- Minimum/maximum bounds prevent unsafe behavior
- Scale-out and scale-in behavior are tested
- Automation is observable and owned
- Cost savings do not compromise performance or resilience targets
Not good enough
- Autoscaling exists but no one can explain the thresholds
- CPU alone is used for a memory- or queue-bound workload
- Scale-in is untested
- No minimum or maximum bounds exist
- Automation failures are silent
- Policies remain unchanged after workload behavior changes
- Review:
- Review after material workload changes, scaling incidents, threshold changes or service/platform changes, and at least annually.
- Expected by:
- COST06-BP03, COST09-BP03
EVD-COST-024Core
Demonstrate that pricing models are selected deliberately using workload behavior, financial constraints and risk rather than default purchasing choices.
Must contain
- Scope and resource/components covered
- Historical and forecast usage
- Steady-state versus elastic usage profile
- Commitment recommendations
- Existing commitments and utilization
- Spot/interruption tolerance
- Pricing options compared
- Break-even or savings analysis
- Business/risk constraints
- Selected pricing model by component
- Coverage/utilization targets
- Review cadence and owner
What good looks like
- Analysis uses real usage data
- Commitment risk and utilization are explicit
- Short-lived and interruptible workloads are distinguished from steady-state usage
- Existing contracts/discounts are considered
- Recommendations are linked to business rules
- Coverage and utilization are reviewed over time
Not good enough
- All workloads remain On-Demand by default
- Commitments are purchased solely from provider recommendations without business review
- Spot is used where interruption cannot be tolerated
- Commitment coverage is maximized without regard to utilization risk
- Pricing analysis is performed once and never revisited
- Review:
- Review material workloads and management-account commitments at least monthly or when usage, pricing, account structure or workload behavior changes materially.
- Expected by:
- COST07-BP01, COST07-BP04, COST07-BP05
EVD-COST-025Core
Demonstrate that Region selection considers cost without violating workload, legal, security or performance requirements.
Must contain
- Workload/component scope
- Candidate Regions
- Service availability
- Regional pricing comparison
- Latency requirements and observations
- Data residency/sovereignty constraints
- Security/compliance constraints
- Resilience requirements
- Data transfer implications
- Migration/change cost
- Selected Region and rationale
- Review trigger
What good looks like
- Cost is compared across valid candidate Regions
- Non-cost constraints are explicit
- Data transfer is included in overall economics
- Selected Region is traceable to evidence
- Migration cost is considered before relocation
Not good enough
- Always using the default Region without review
- Selecting the cheapest Region regardless of sovereignty or latency
- Ignoring cross-Region transfer charges
- Comparing headline prices only
- Treating Region choice as permanent
- Review:
- Review when selecting a new Region, materially changing workload geography, or when major pricing, compliance or latency assumptions change.
- Expected by:
- COST07-BP02
EVD-COST-026Core
Demonstrate that third-party agreements have cost-efficient terms that scale with value and usage rather than creating disproportionate cost growth.
Must contain
- Supplier/service scope
- Business value/outcomes
- Pricing metric and charging basis
- Current and forecast usage
- Tier/volume economics
- Minimum commitments
- Renewal and termination terms
- Support/management charges
- Total cost scenarios
- Alternative suppliers/options
- Lock-in and switching cost
- Recommendation and approval
What good looks like
- Charges scale with delivered value or usage
- Forecast scenarios show cost growth
- Contractual constraints are visible
- Alternatives are compared
- Renewal decisions are evidence-based
- Procurement and technical stakeholders both review the model
Not good enough
- Paying a percentage of total cloud bill for a tool that optimizes only part of the bill
- Renewing by default
- Ignoring minimum commitments or exit costs
- Evaluating license price without operational/service value
- No forecast of cost as usage grows
- Review:
- Review before purchase/renewal and when usage, pricing tiers, service scope or business value changes materially.
- Expected by:
- COST07-BP03
EVD-COST-027Core
Demonstrate that data-transfer cost is understood as an architectural variable and can be traced to specific paths, volumes and business requirements.
Must contain
- Workload/component scope
- Source and destination
- Traffic direction
- Expected and peak volume
- Transfer path/service
- AZ/Region boundary
- Applicable pricing basis
- Monthly/annual cost estimate
- Replication/backup traffic
- Business benefit/requirement
- Assumptions
- Review trigger
What good looks like
- All material transfer boundaries are visible
- Volumes are evidence-based or forecast explicitly
- Cross-AZ/cross-Region and internet paths are not conflated
- Replication and backup traffic are included
- Model can be reconciled to actual billing data
Not good enough
- Treating data transfer as free
- Modeling only internet egress
- Ignoring cross-AZ or centralized inspection hairpins
- Omitting replication/backup traffic
- Using a single percentage uplift instead of path-level modeling
- Review:
- Review when architecture, traffic patterns, Regions/AZs, connectivity or transfer pricing change materially.
- Expected by:
- COST08-BP01, COST08-BP02, COST08-BP03
EVD-COST-028Core
Demonstrate that transfer-cost optimization decisions have been implemented and validated against real traffic and cost outcomes.
Must contain
- Baseline transfer paths/cost
- Optimization opportunity
- Candidate architecture/service options
- Selected change
- Security/resilience constraints
- Expected savings
- Implementation details
- Traffic validation
- Cost validation
- Operational owner
- Rollback/exception notes
- Review date
What good looks like
- Optimization addresses a measured transfer path
- Security and resilience constraints are explicit
- Expected savings are quantified
- Implementation is validated with observed traffic and cost data
- Unintended cross-AZ/cross-Region effects are checked
Not good enough
- Adding CDN/cache without measuring the expensive path
- Centralizing traffic through costly inspection paths without modeling
- Reducing redundancy solely for cost
- Assuming implementation savings without billing validation
- Optimizing bytes while creating operational fragility
- Review:
- Review after major architecture/network changes and when transfer-cost anomalies or growth appear.
- Expected by:
- COST08-BP02, COST08-BP03
EVD-COST-029Core
Demonstrate that demand-management and supply decisions are based on representative workload behavior over time rather than a single utilization snapshot.
Must contain
- Workload/component scope
- Demand metric and source
- Historical baseline
- Peak demand
- Seasonal patterns
- Event-driven spikes
- Rate of change
- Forecast demand
- Required response time
- Maximum acceptable delay
- Known business events
- Confidence/assumptions
- Review trigger and owner
What good looks like
- Demand data covers representative operating periods
- Peaks and seasonality are visible
- Forecast assumptions are explicit
- Business-output and technical demand measures are connected
- Response-time constraints are documented
- Analysis leads to demand or supply decisions
Not good enough
- Sizing from average demand only
- Ignoring seasonal or event peaks
- Using infrastructure utilization without workload demand context
- Forecasting without confidence or assumptions
- No link between demand analysis and scaling/buffering decisions
- Review:
- Review when workload demand patterns, customer behavior, business events or service requirements change materially, and at least quarterly for material workloads.
- Expected by:
- COST09-BP01
EVD-COST-030Core
Demonstrate that demand peaks are intentionally controlled so workloads can operate with less provisioned capacity without creating unacceptable delay or retry amplification.
Must contain
- Workload/request scope
- Demand source
- Buffer/throttle mechanism
- Queue or buffer capacity
- Throttle limits
- Retry/backoff behavior
- Maximum acceptable delay
- Timeouts and expiry
- Dead-letter/failure handling
- Backlog/saturation thresholds
- Observability and alerts
- Owner and override route
- Load-test evidence
What good looks like
- Retry behavior is understood
- Queue and throttle limits are explicit
- Maximum delay is aligned to business/service requirements
- Back-pressure prevents uncontrolled resource growth
- Failure and saturation behavior are tested
- Backlog metrics and alerts are owned
Not good enough
- Clients retry immediately and amplify load
- Queue exists with no capacity or age limits
- Throttle returns errors with no retry guidance
- Backlog can grow indefinitely
- Buffering is used where synchronous response is mandatory
- No alerting on queue age or saturation
- Review:
- Review after material demand changes, retry incidents, queue/backlog saturation, SLO changes or architecture changes, and at least annually.
- Expected by:
- COST09-BP02
EVD-COST-031Core
Demonstrate that operational automation is targeted where it reduces meaningful human effort, error risk and recurring cost rather than being implemented for its own sake.
Must contain
- Operational activity
- Frequency / volume
- Manual effort per occurrence
- People / role cost assumption
- Annualized effort and cost
- Error / rework risk
- Automation candidate
- Implementation effort
- Expected effort reduction
- Expected error reduction
- Payback or value rationale
- Priority
- Owner
- Outcome after implementation
What good looks like
- Uses observed or defensible effort data
- Annualizes recurring effort rather than focusing on isolated tasks
- Considers both labor cost and error/rework risk
- Prioritizes repetitive, high-value, time-consuming or error-prone work
- Compares automation effort with expected benefit
- Measures realized outcome after implementation
Not good enough
- Automating low-frequency tasks with negligible benefit
- Ignoring the engineering cost of automation
- Using automation count as a success metric
- Assuming all manual work should be automated
- Claiming savings without baseline effort data
- Failing to account for maintenance of the automation itself
- Review:
- Review at least quarterly for material workloads and when operating processes, staffing, service architecture or automation tooling changes materially.
- Expected by:
- COST11-BP01
EVD-DATA-001Core
Demonstrate that retention and deletion periods are based on business, legal, regulatory, contractual and recovery requirements rather than indefinite storage by default.
Must contain
- Data/object class
- Business/system scope
- Retention purpose
- Required minimum retention period
- Maximum retention/deletion requirement where applicable
- Legal/regulatory/contractual basis
- Recovery/backup requirement
- Storage class/tier transition rule where applicable
- Deletion/disposal rule
- Lifecycle automation/control location
- Exception authority and expiry
- Owner
- Review cadence and version history
What good looks like
- Retention periods have an explicit business or compliance basis
- Backup/snapshot retention is differentiated from primary data where needed
- Minimum and maximum retention requirements are not conflated
- Lifecycle controls implement the approved policy where technically possible
- Exceptions expire and are reviewed
- Deletion evidence can be produced for material obligations
Not good enough
- Keep everything forever just in case
- Delete old data solely because storage is expensive
- Backup retention is undefined
- Lifecycle rules exist but are not mapped to policy requirements
- Legal hold exceptions never expire
- Different environments retain the same data indefinitely without rationale
- Review:
- Review at least annually and when legal/regulatory, business, recovery or storage requirements materially change.
- Expected by:
- COST04-BP02, COST04-BP05, SEC07-BP04
EVD-DATA-002Core
Demonstrate that data is classified by business value and handling need so storage and lifecycle choices can be efficient without weakening governance.
Must contain
- Data classes
- Business criticality criteria
- Confidentiality/integrity/availability criteria
- Retention expectations
- Storage/handling rules by class
- Tagging/catalog requirements
- Ownership
- Review cadence
What good looks like
- Classification is business-meaningful
- Handling rules differ by class
- Data catalog/tagging supports enforcement
- Storage/lifecycle choices link to classification
- Unclassified data is actively identified
Not good enough
- Single class for all data
- Classification only for security, not lifecycle
- No catalog or tagging
- Storage tier unrelated to class
- Unclassified data persists indefinitely
- Review:
- Review at least annually and when regulatory, business-criticality or data-handling requirements change materially.
- Expected by:
- SEC07-BP01, SEC07-BP02, SEC07-BP03, SEC07-BP04
EVD-GOV-002Core
Demonstrate that identified governance requirements affect real workload design and operation rather than existing only as policy statements or register entries.
Must contain
- Governance requirement or requirement identifier
- Corresponding workload control, design constraint, platform guardrail or operational mechanism
- Responsible implementation owner
- Validation or conformance method
- Current implementation/validation status
What good looks like
- Every material mapping is traceable back to an applicable governance requirement
- Mappings identify actual workload mechanisms rather than restating the source policy
- Responsible implementation ownership is explicit
- Validation methods are specific enough to determine whether the mapped mechanism is operating
- The mapping is used during design and change activity, not assembled retrospectively for audit
Not good enough
- The mapping simply copies requirement text into a second column
- Controls are listed with no traceability to the governance requirement they address
- Implementation owner or validation method is missing
- A policy-as-code rule is assumed to prove the whole governance requirement when it validates only one technical aspect
- The matrix exists only for assurance reviews and is not used when workload changes are designed
- Review:
- Update whenever a mapped governance requirement, workload design, control or validation method changes; review alongside the Governance Requirements Register.
- Expected by:
- COST02-BP01, COST02-BP04, COST02-BP05
EVD-SEC-001Core
Demonstrate that material security threats are systematically identified and prioritised against the actual workload architecture, that mitigation choices respond to those threats, and that the analysis is refreshed as the workload or external threat landscape changes.
Must contain
- Workload/system scope and security-relevant business assets
- Relevant architecture, data flows and trust boundaries
- Threat actors, threat sources and material assumptions
- Threat scenarios, attack paths or abuse cases
- Likelihood/probability and potential business/security impact
- Threat priority or risk ranking
- Preventive, detective and responsive mitigations planned or in place
- Residual exposure, gaps or accepted limitations
- Owner/action status for material unresolved threats
- Last reviewed date and explicit review/change triggers
What good looks like
- The model reflects the current workload architecture and data flows rather than a generic security checklist
- Threat scenarios are specific enough to influence design and control choices
- Prioritisation considers both probability and business impact or harm
- Mitigations are traceable to material threats and distinguish planned from implemented controls
- Material residual exposure is visible and can feed the wider Risk Register
- Threat intelligence, vulnerabilities, incidents and architecture changes can trigger reassessment
- The model includes trust boundaries and attack paths where they materially affect exposure
- The model is revisited throughout workload evolution rather than produced once during initial design
Not good enough
- A one-time architecture diagram labelled as a threat model with no explicit threat scenarios
- A generic OWASP, STRIDE or MITRE list copied into the record without workload-specific analysis
- The model is not updated after material architecture, data-flow or trust-boundary changes
- Threats are listed but have no prioritisation, mitigation or owner
- Tool findings are treated as the threat model rather than inputs to analysis
- The model records only implemented controls and hides unresolved or residual exposure
- Threat modelling is performed only immediately before assurance review rather than as part of design and change
- Review:
- Review on an agreed security/risk cadence and after material architecture, data-flow, trust-boundary, threat-intelligence, vulnerability or incident changes that could alter the threat picture.
- Expected by:
- SEC01-BP03, SEC01-BP04, SEC01-BP07
EVD-SEC-002Core
Demonstrate that security boundaries are deliberately established at account/environment level so workloads, teams and environments are isolated appropriately and centrally governed controls are inherited consistently.
Must contain
- Current account/environment/workload inventory in scope
- Business, environment, sensitivity or compliance rationale for major boundaries
- Organisation/grouping structure and inherited policy/guardrail hierarchy
- Named owner or responsible team for each major boundary
- Delegated administration and privileged-access model
- Standard account/environment creation baseline
- Logging, security monitoring and configuration guardrails applied by default
- Cross-account/environment access patterns and constraints
- Approved exceptions with owner, rationale and review/expiry date
- Last reviewed date and material change triggers
What good looks like
- Production and non-production boundaries are explicit where risk justifies separation
- High-risk or regulated workloads can be identified and treated differently
- Guardrails are inherited centrally rather than recreated manually per account
- Ownership and delegated administration are clear
- The model matches the real cloud estate rather than an aspirational diagram
- Cross-account access is deliberate and reviewable
- Exceptions are visible and time-bounded where appropriate
Not good enough
- All workloads share one administrative account or subscription without a risk-based reason
- Accounts are created ad hoc with inconsistent logging, monitoring or guardrails
- Environment names imply separation but privileges or shared services bypass the boundary
- Ownership is inferred from billing labels only
- Exceptions become permanent undocumented architecture
- The diagram is current but policy inheritance and delegated administration are not represented
- Review:
- Review after material organisation, account, environment, ownership, guardrail or compliance changes and periodically against the actual cloud estate.
- Expected by:
- SEC01-BP01
EVD-SEC-003Core
Demonstrate that the most privileged cloud account identity is protected from routine use, difficult to compromise, observable when used and recoverable under a controlled emergency process.
Must contain
- Account identifier and accountable owning organisation/team
- Confirmation that root/equivalent programmatic access keys are absent where supported
- MFA status and approved authentication method
- Recovery email ownership and security controls
- Recovery phone ownership and security controls
- Preventive restrictions or central controls reducing routine root use
- Root/break-glass activity monitoring and alerting
- Emergency-use procedure, required approvals and two-person control where adopted
- Last root/break-glass use and reason, or confirmation of no use in review period
- Contingency/recovery test date and outcome where practical
- Exceptions, gaps and remediation owner
- Last reviewed date and next review/trigger
What good looks like
- Every in-scope account has a current control record
- Programmatic root/equivalent credentials are absent unless an exceptional provider-specific need exists
- MFA and recovery channels are controlled independently of a single individual
- Use generates a high-signal alert and durable audit trail
- Emergency access is documented and tested without normalising routine use
- Any root use is explicitly reviewed after the event
- New accounts enter the control process automatically
Not good enough
- A screenshot of MFA is treated as the entire root-account control
- Recovery email or phone belongs to a departing employee
- Root access keys exist because they are 'not currently used'
- Root activity is logged but no one is alerted or reviews it
- Emergency credentials are so inaccessible that recovery has never been tested
- The record is maintained manually but new accounts can be missed
- Routine billing or administration is performed as root
- Review:
- Review on a defined privileged-access cadence and after account creation, credential/recovery changes, root/break-glass use or relevant security incidents.
- Expected by:
- SEC01-BP02
EVD-SEC-004Core
Demonstrate that security controls are selected for explicit risk/compliance outcomes and are continuously validated for effectiveness rather than accumulated as an unstructured checklist.
Must contain
- Stable control-objective identifier and outcome statement
- Source threat, risk, compliance or governance requirement
- Applicable workload/system/data scope
- Preventive, detective and responsive controls implementing the objective
- Control owner and operating responsibility
- Implementation mechanism or platform guardrail
- Validation/test method and cadence
- Current effectiveness or conformance status
- Point-in-time and/or period evidence source
- Known gaps, exceptions or compensating controls
- Remediation owner/status where applicable
- Last reviewed date and change/review trigger
What good looks like
- Each objective expresses an outcome rather than naming a product configuration
- Control selection can be traced to threats, risks or obligations
- Controls and validation evidence are separated conceptually
- Effectiveness is tested, not inferred from configuration presence alone
- Control ownership and validation ownership are clear
- Automated evidence is used where it improves coverage and currency
- Gaps and compensating controls are visible rather than hidden
Not good enough
- A list of security products is treated as a set of control objectives
- Controls are mapped to compliance citations but not to the security outcome they achieve
- Configuration presence is treated as proof of effectiveness
- Evidence is collected only immediately before audit
- One control owner is assumed to validate their own control without appropriate review
- Threat-model findings do not alter control objectives or priorities
- Review:
- Review when threat models, compliance obligations, architecture or controls change, and at the cadence required to validate control effectiveness.
- Expected by:
- SEC01-BP03, SEC01-BP07, SEC07-BP02, SEC08-BP02
EVD-SEC-005Core
Demonstrate that emerging security information is systematically consumed, assessed against the workload and converted into timely mitigation, threat-model/control updates or explicit no-action decisions.
Must contain
- Source and advisory/threat/recommendation identifier
- Publication/observed date and severity/priority where applicable
- Affected technology, workload, dependency or security capability
- Applicability assessment and rationale
- Potential business/security impact
- Required mitigation, patch, configuration or evaluation action
- Named owner and target date
- Current status and closure evidence
- Reference to Threat Model, Risk Register or control objective where materially affected
- Decision/rationale where no action is required
- Last review timestamp and source-monitoring cadence
What good looks like
- Primary and trusted external sources are defined rather than relying on ad hoc discovery
- High-severity items have an expedited triage path
- Applicability is assessed against actual workload inventory/dependencies
- Actions are tracked through closure
- Material changes update threat models, risks or control objectives rather than remaining isolated tickets
- No-action decisions retain rationale
- Provider recommendations are evaluated, not blindly implemented
Not good enough
- Teams subscribe to security bulletins but cannot show what was assessed
- Every advisory generates work regardless of applicability
- Only CVEs are tracked while cloud/provider configuration recommendations are ignored
- A threat-intelligence feed is treated as evidence without showing resulting decisions
- Items are marked closed when a ticket is created rather than when mitigation is verified
- New security features are adopted because they are new rather than because they improve the risk/control posture
- Review:
- Maintain continuously or at an agreed security-review cadence, with expedited review for high-severity or actively exploited threats.
- Expected by:
- SEC01-BP04, SEC06-BP01, SEC06-BP02
EVD-SEC-007Core
Demonstrate that standard security controls can be deployed repeatably and verified automatically rather than relying on workload teams or a central security team to reimplement controls manually for each deployment.
Must contain
- Baseline/control package identity, version and owner
- Security control objectives implemented by the baseline
- Infrastructure-as-code, policy-as-code or configuration definitions
- Intended deployment scope/accounts/environments/workload classes
- Required inputs and permitted configuration variation
- Automated unit/static/policy/security tests
- Deployment pipeline and approval/change controls
- Guardrails preventing or detecting unsafe configuration
- Self-service consumption path for workload teams where applicable
- Drift/conformance monitoring after deployment
- Rollback/recovery and backup/version-retention approach
- Supported/deprecated versions and migration expectations
- Change history and review date
What good looks like
- Baseline definitions are version controlled and reviewed like production code
- Tests fail insecure or non-compliant changes before deployment
- Secure defaults require less effort than bypassing them
- Workload teams can consume approved controls without bespoke security-team tickets for routine cases
- Post-deployment drift is detected
- Baseline changes can be rolled back or recovered
- Control objectives are traceable to the baseline and its validation evidence
- Version/deprecation lifecycle is managed
Not good enough
- A wiki page describes the baseline but teams implement it manually
- A central security team deploys every control by request
- Templates exist but have no automated security or policy tests
- Workload teams fork templates and cannot consume upstream security fixes
- Baseline success is measured by template deployment, not resulting control conformance
- Emergency manual changes are never reconciled back into code
- No supported-version or migration policy exists
- Review:
- Review with every material baseline/template version and at a defined security-engineering cadence; retain version history and supported versions.
- Expected by:
- SEC05-BP02, SEC05-BP04, SEC06-BP02, SEC06-BP04, SEC06-BP05, SEC08-BP03, SEC09-BP02, SEC11-BP06
EVD-SEC-008Core
Demonstrate that network topology is deliberately layered by function, data sensitivity and behaviour, and that only the flows each workload needs are permitted, both at layer boundaries and inside them.
Must contain
- Scope: workloads, environments, VPCs/networks and accounts covered
- Layer inventory with the rationale for each layer (function, data sensitivity, behaviour)
- Components placed in each layer, including managed services and private endpoints
- Public entry points and how they are fronted (load balancer, CDN, API gateway)
- Permitted flows: source, destination, port/protocol, direction and business purpose, covering both external (north-south) and internal (east-west) traffic
- Controls enforcing each boundary and flow (e.g. security groups, route tables, network ACLs, private connectivity, firewalls)
- Egress policy, including which external domains or destinations are allowed
- Approach for connectivity between networks/accounts (point-to-point vs routed)
- Exceptions with owner, rationale and review/expiry date
- Date and method of the last reconciliation with actual configuration
What good looks like
- Layers reflect data sensitivity and behaviour, not just default subnet patterns
- Every permitted flow is listed and justified
- Both inbound and outbound traffic are controlled
- Controls exist within layers, not only at the perimeter
- The model has been checked against real configuration, for example with network path or reachability analysis
- Point-to-point connectivity is preferred to broad network peering where practical
- Exceptions are visible and time-bounded
Not good enough
- All resources sit in one network or subnet
- The diagram shows tiers, but security rules allow broad address ranges between them
- Only inbound traffic is controlled; outbound is open
- Traffic inside a layer is assumed to be trusted
- Networks are peered wholesale when only a few components need to talk
- The model has never been compared with the real configuration
- 'Temporary' rules have no owner or expiry
- Review:
- Review when workloads, network topology or data sensitivity change materially, and reconcile periodically against actual configuration.
- Expected by:
- SEC05-BP01, SEC05-BP02, SEC05-BP03, SEC05-BP04, SEC09-BP02, SEC09-BP03
EVD-SEC-009Core
Demonstrate that traffic crossing network layers is inspected and authorised using explicit rules, maintained threat intelligence and baseline comparison, with stricter protection closer to sensitive data.
Must contain
- Inspection points: where traffic is inspected (public endpoints, between layers, egress) and the inspection model (inline, centralised, out-of-band)
- Inspection technology at each point (e.g. web application firewall, network firewall, intrusion prevention)
- Rule sets applied at each point: custom rules and managed/threat-intelligence rule groups
- Handling of encrypted traffic (where TLS is inspected or not, and why)
- Baseline of normal traffic used to spot anomalies
- Rule ownership, change process and update cadence
- How alerts and blocked traffic reach detection and response
- Known gaps or uninspected paths, with owner and rationale
What good looks like
- Inspection covers internal layer boundaries, not just the internet edge
- Managed or threat-intelligence rules are in use and kept current
- Custom rules have owners and are reviewed
- Protection gets stricter closer to sensitive data
- Inspection findings are routed to someone who acts on them
- Rule changes go through a controlled, testable process
- Uninspected paths are known and justified
Not good enough
- Only port and protocol rules; no content or behaviour inspection
- Inspection only at the internet edge
- Rules written for one past threat and never revisited
- Alerts go to a mailbox nobody reads
- No baseline, so anomalies can't be recognised
- Encrypted traffic is assumed safe without a decision recorded
- Review:
- Review rule sets continuously through managed updates; review custom rules, coverage and gaps after material threat, topology or workload changes and at least periodically.
- Expected by:
- SEC05-BP03, SEC05-BP04
EVD-SEC-010Core
Demonstrate that authentication requirements are defined once, applied to every identity type, and enforced by technical controls rather than left to individual teams or users.
Must contain
- Scope: identity types covered (workforce, root/break-glass, machine, external/customer)
- Approved sign-in methods for each identity type
- MFA requirement and acceptable factor types, including phishing-resistant options for privileged users
- Password or passphrase rules, referencing an external standard where used (e.g. NIST SP 800-63)
- Federation requirement: which access must go through the central identity provider
- Permitted credential types and where long-term credentials are prohibited
- Detection and response for suspicious or anomalous sign-ins
- How each requirement is technically enforced
- Exceptions with owner, rationale and expiry
- Owner, approval date and review date
What good looks like
- Every identity type is covered, including machine and emergency identities
- MFA is required, not just available
- Requirements are enforced by configuration, not only stated in policy
- Long-term credentials are explicitly restricted
- Suspicious sign-in detection is defined and someone acts on it
- Exceptions are few, owned and time-limited
Not good enough
- A policy that says 'MFA recommended'
- Root and break-glass identities left out of scope
- Different teams apply different sign-in rules
- Requirements written down but not enforced in the identity provider
- No mention of machine identities
- Review:
- Review annually and after changes to identity providers, regulatory requirements or significant authentication incidents.
- Expected by:
- SEC02-BP01, SEC02-BP02, SEC02-BP04, SEC03-BP01, SEC09-BP03
EVD-SEC-011Core
Demonstrate that long-term credentials and secrets are known, minimised, stored in a purpose-built secrets service, rotated, audited, and kept out of code and configuration.
Must contain
- Scope: workloads, accounts and environments covered
- Each long-term credential or secret: type (access key, password, API token, certificate, etc.) and purpose
- Consuming identity or system
- Storage location (secrets service, parameter store, other)
- Owner
- Rotation method (automatic/manual), interval, and last rotation date
- Last audit or access-review date
- Justification where a temporary credential is not used, and the planned replacement
- Detection of secrets in code repositories or artefacts
- Exceptions with owner and expiry
What good looks like
- The inventory is generated or reconciled from real configuration, not maintained only by hand
- Long-term credentials are a short, justified list, shrinking over time
- Secrets are held in a purpose-built secrets service
- Rotation is automatic where possible and overdue items are visible
- Repositories are scanned for committed secrets
- Every item has an owner
Not good enough
- Access keys for machines where roles could be used
- Secrets in source code, environment files or wikis
- A spreadsheet nobody reconciles
- Rotation 'planned' but never done
- Credentials shared between people or systems
- No owner for service credentials
- Review:
- Reconcile at least quarterly against real configuration, and immediately after any suspected credential exposure.
- Expected by:
- SEC02-BP02, SEC08-BP01, SEC09-BP01
EVD-SEC-012Core
Demonstrate that identities are managed centrally, that access follows people's actual role and status automatically, and that groups and attributes rather than individual assignments drive permissions.
Must contain
- Authoritative identity source(s) and the central identity provider
- How the provider connects to cloud accounts and key applications (federation, synchronisation)
- Identities that sit outside the central provider, with justification
- Joiner, mover and leaver process: trigger, steps, timing and owner
- Group model: groups, their purpose and owners
- Attributes used for access decisions, their source and how they're kept accurate
- How permissions are assigned to groups or attributes rather than individuals
- Periodic access review: frequency, reviewer, evidence of completion
- Recent lifecycle metrics (e.g. leaver deprovisioning time)
What good looks like
- One authoritative source for workforce identity
- Access is removed automatically when someone leaves or changes role
- Permissions attach to groups or attributes, not individual users
- Group ownership is defined and memberships are reviewed
- Attributes used for access come from an authoritative system
- Few identities sit outside the central provider, each justified
Not good enough
- Separate local user accounts in each cloud account or application
- Leavers removed manually, weeks later
- Permissions granted to individuals one by one
- Groups with no owner and growing membership
- Attributes typed in by hand and never checked
- Review:
- Review the design annually and after identity platform changes; review access and group membership at least periodically according to risk.
- Expected by:
- SEC02-BP04, SEC03-BP01, SEC03-BP04
EVD-SEC-013Core
Demonstrate that access requirements are defined deliberately for people and machines before permissions are granted, and that permissions come from a documented model rather than being granted case by case.
Must contain
- Workloads, accounts and environments in scope
- Identity types and the authentication method used for each
- Per-component statement of who or what needs access, why, and for how long
- Job role matrix showing access levels required for each role
- Groups, permission sets or attribute rules through which permissions are assigned
- Which identities hold administrator permissions, and why
- Rules for access to production environments and how that access is time-limited
- Permissions boundaries or guardrails that cap delegated permission management
- How machine identities obtain access and which use long-term credentials, with justification
- Last reviewed date and owner
What good looks like
- Every permission traces back to a stated access requirement
- Permissions attach to groups, roles or attributes rather than individual users
- Administrator access is held by a small, named group
- Production access is limited to a valid use case and removed afterwards
- Machine identities use temporary credentials wherever possible
- The model reflects what is actually deployed, not an aspirational design
Not good enough
- Granting administrator permissions by default
- Custom permissions created for each individual user
- Hard-coding or storing secrets in the application
- Relying on long-lived credentials where temporary ones are available
- Using the root user for day-to-day work
- Overly permissive policies that are not properly scoped
- Relying only on tags or attributes to separate environments
- Review:
- Review when workloads, roles or identity arrangements change materially, and periodically against actual permissions.
- Expected by:
- SEC03-BP01, SEC03-BP02, SEC03-BP04
EVD-SEC-014Core
Demonstrate that authorised administrators can still reach cloud resources if normal access fails, that the route cannot easily be misused, and that it has been tested rather than assumed to work.
Must contain
- Defined failure modes that count as an emergency, with how each is confirmed
- Conditions where the process must not be used, and the alternative route
- Emergency access mechanism for each failure mode and the resources created in advance
- Statement of which systems the emergency route does and does not depend on
- Authorised initiators and approvers, including out-of-hours and escalation arrangements
- Link between each emergency access request and the incident record
- Audit logging and alerting for use of the route, including use outside a declared emergency
- Steps to rotate credentials and notify teams after use
- Results of the most recent test, including time taken and issues found
- Test frequency and the incident response or recovery exercise it forms part of
What good looks like
- Each failure mode has its own specific, documented process
- The emergency route works when the normal identity provider is unavailable
- Every use is logged, attributable and matched to an incident
- Use outside a declared emergency raises an alert
- The procedure has been tested within the last review period
- Instructions are simple enough to follow under pressure
Not good enough
- No documented or tested emergency process, so people improvise
- Emergency access depends on the same identity provider as normal access
- The emergency route is used for routine changes because it is easier than the pipeline
- Emergency access generates too few logs, or logs nobody monitors
- Emergency credentials are not rotated after use
- Review:
- Review after any change to the identity provider or federation set-up, and test periodically as part of incident response and recovery exercises.
- Expected by:
- SEC03-BP03, SEC10-BP05
EVD-SEC-015Core
Demonstrate that the maximum permissions available to identities are deliberately limited in layers, so undesired access cannot be granted even when an individual permission policy would allow it.
Must contain
- Account and organisational unit structure the guardrails attach to
- Each guardrail, its layer, its purpose and where it is applied
- Whether the approach is an allow list or a deny list, and why
- Which accounts, principals and resources are not covered, and the compensating controls
- Permissions boundaries applied to roles that workload teams use to manage their own permissions
- Resource and trust policy conditions that restrict who can access or assume
- Approach for temporary elevated access and privileged actions
- Approved exceptions with owner, rationale and review date
- How guardrail changes are tested before they are applied
- Last reviewed date and owner
What good looks like
- Workloads and environments are isolated in separate accounts before other guardrails are layered on
- Broad guardrails sit near the organisation root and stricter ones nearer individual accounts
- The register states what the guardrails do not cover
- Delegated permission management is capped by boundaries
- Exceptions are visible and time-bounded
- Changes are tested before they reach production accounts
Not good enough
- Member accounts created without organisation-level restrictions on their root credentials
- Least privilege applied to permissions, but no cap on what can be granted
- Relying on implicit deny, trusting that no policy will explicitly allow something unwanted
- Several environments in one account, separated only by tags, networks or resource policies
- Running workloads in the organisation management account
- Review:
- Review after material changes to the account structure, organisation policies or compliance obligations, and periodically against deployed policies.
- Expected by:
- SEC03-BP02, SEC03-BP05
EVD-SEC-016Core
Demonstrate that the organisation knows which resources are shared and with whom, which permissions are unused, and that findings are reviewed, justified or removed on a regular basis.
Must contain
- Accounts and identities covered by analysis, and any that are not
- Tools and sources used to find unused, public and cross-account access
- Policy for how long access can go unused before it is reviewed or removed
- Unused identities, credentials or permissions found and the action taken
- Public and cross-account findings with justification, approver and status
- Inventory of resources shared within the organisation and the sharing mechanism
- Baseline stating what must and must not be shared
- Third parties with access, the role or credential used, scope and last review date
- Whether external identifiers and temporary credentials are used for third-party access
- Alerting arrangements and date of the most recent review
What good looks like
- Analysis covers all accounts in the organisation, not just some
- Every public or cross-account finding is justified, approved or closed
- Unused access is removed on a defined timescale
- There is a baseline for what may be shared
- Third-party access uses roles and temporary credentials rather than long-term keys
- Unexpected sharing is alerted rather than found at the next review
Not good enough
- No inventory of shared resources
- No approval process for public or cross-account access
- No continuous monitoring or alerting for unexpected external sharing
- Permission policies kept after they are no longer needed
- Default trust policies or long-term credentials used for third parties
- Third-party identifiers reused across customers or tenants
- Review:
- Review findings continuously through alerting and formally at a regular interval set by risk, and after organisation or supplier changes.
- Expected by:
- SEC03-BP04, SEC08-BP04
EVD-SEC-017Core
Demonstrate that security-relevant logs are switched on across accounts, services and applications, kept for the right length of time, protected, and can be retrieved quickly when an investigation or audit needs them.
Must contain
- Log sources in scope: account activity, network, DNS, load balancer and web filter, resource, operating system and application logs
- Why each source is collected and the use cases it supports, such as investigation, alerting or compliance
- Where each source is stored and in which account
- Retention period and lifecycle rule for each source, and the requirement behind it
- Split between logs kept readily searchable and logs archived
- Who can read, query, change or delete the logs
- How log integrity is protected and checked
- Querying and alerting tools used for each source
- Accounts, Regions and workloads covered, and known gaps
- Date of the last review and who approved the log scope
What good looks like
- Coverage is stated per account and workload, with gaps listed
- Every log source has a stated reason and retention period
- Retention reflects legal, regulatory and business requirements, not defaults
- Access to logs is restricted and write or delete access is tightly limited
- Integrity is checked routinely, not only after an incident
- Logging is enabled by code or policy so new accounts are covered automatically
Not good enough
- Logs kept indefinitely, or deleted too soon
- Everybody can read or alter the logs
- Every type of log stored just in case
- Logging switched on by hand, account by account
- Log integrity checked only when something goes wrong
- Log sources known only to the team that set them up
- Review:
- Check coverage continuously through automated configuration checks, and review the register when workloads, accounts or obligations change and at least annually.
- Expected by:
- SEC04-BP01, SEC04-BP02, SEC06-BP03
EVD-SEC-018Core
Demonstrate that security data is collected in agreed, protected locations that give analysts one place to correlate it, rather than sitting in separate workload accounts.
Must contain
- Accounts or locations that hold security data, and why they are separate from workloads
- Sources publishing into the standard locations, and any not yet connected
- Data formats and schemas used, and how data from other tools is normalised
- Regions covered, including opted-in Regions not in active use
- Data sovereignty, localisation and compliance constraints, and any extra locations they require
- Access model: who and what can read, write and administer, and how tools reach the data across accounts
- Retention and lifecycle rules, and how they link to the data classification policy
- Tools that query, correlate and visualise the data, and how they are integrated
- Controls protecting the integrity and availability of the data store
- Owner, change process and date of the last review
What good looks like
- Security data is held separately from the workloads that produce it
- Every in-scope source is connected or has a recorded exception
- Formats are standardised so tools need no custom transformation for each source
- Access is granted by role and reviewed, with write access tightly limited
- Sovereignty and compliance constraints are recorded and met
- Opted-in Regions are covered even when they are not in use
Not good enough
- Each team runs its own logging and metrics collection
- Security data left in the account that produced it
- No access controls limiting who can view or alter collected data
- Security data outside the data classification policy
- Sovereignty and localisation rules ignored
- Custom transformation built for every source
- Review:
- Review when accounts, Regions, tools or regulatory scope change, and at least annually.
- Expected by:
- SEC04-BP01, SEC04-BP02, SEC04-BP03
EVD-SEC-019Core
Demonstrate that alerts from different sources are combined and given context so investigators can judge true severity quickly, and that each alert type has an owner and a documented next step.
Must contain
- Alert sources in scope, including cloud security services, log analysis, billing alarms, third-party feeds and reports from people
- How each source represents identity, action and resource, and the mappings used to link them
- Where alerts are captured and how they reach the investigating team
- Correlation approach (tooling, custom pipelines or both) and the rules or queries in use
- Enrichment sources such as account metadata, ownership, asset criticality and threat intelligence
- How initial alert criticality is reviewed and adjusted using context
- Owner, escalation route and target timescale for each alert type
- A runbook or playbook entry for each alert or finding type, stating what to check and who acts
- Alert sources with no correlation or runbook, and the plan to close the gap
- Date of the last review and rule tuning
What good looks like
- Alerts from different sources reach one place, not separate inboxes
- Identities, actions and resources are mapped across sources
- Enrichment is automatic rather than assembled by hand by investigators
- Criticality is adjusted using context, not only the source tool's rating
- Every alert type has an owner and a documented first response
- Rules are tuned regularly and false positives are tracked
Not good enough
- Different teams investigate each system's alerts in isolation
- Alerts gathered centrally but correlated by hand
- Relying only on the detection tool's own severity rating
- Alerts sent to a team that cannot act on them
- Alert types with no runbook or playbook
- Alert rules never reviewed or tuned
- Review:
- Tune rules continuously and review the model when alert sources, tools or teams change, and at least annually.
- Expected by:
- SEC04-BP03, SEC04-BP04
EVD-SEC-020Core
Demonstrate that non-compliant resources are detected and fixed promptly and consistently, that automation is tested and overseen, and that outcomes are reviewed.
Must contain
- Configuration standards or control objectives the rules enforce
- Detection source for each rule
- Remediation for each rule, and whether it is defined as code
- Whether each remediation is manual or automatic, and why
- Trigger mechanism for each remediation
- Identity and permissions used to remediate, scoped to least privilege
- Testing and approval record before a remediation is enabled automatically
- Oversight arrangements: notifications, human override and rollback
- Log of actions taken and outcomes, and how they are reviewed
- Situations needing human judgement with no automated remediation, and who handles them
What good looks like
- Each rule traces to a stated configuration standard
- Remediations are defined as code and version controlled
- Automatic remediations have been tested and can be stopped or reversed
- Remediation identities have only the permissions they need
- Outcomes are recorded and reviewed
- Resource owners are told when their resource is changed
Not good enough
- Automation enabled without testing
- Fully automatic remediation with no way for people to step in
- Remediation identities with broad permissions
- Remediation treated as the whole response rather than one part of incident response
- No record of what automation changed
- Resource owners not told about changes
- Review:
- Review outcomes continuously, and review the rules and remediations when standards, tools or workloads change and at least annually.
- Expected by:
- SEC04-BP04, SEC06-BP01, SEC06-BP05, SEC10-BP06
EVD-SEC-021Core
Demonstrate that classification is tested against actual data and resources, not just asserted in policy, and that findings lead to a controlled response.
Must contain
- Accounts, repositories, storage services and data flows included in scans
- Tools, schedules, and authorised sampling techniques
- Classification policy and rules applied, including sensitive-data identifiers
- Detected data locations, sensitivity classes and confidence/false positives
- Unscanned resources and exceptions with owners
- Unauthorised locations, handling and access findings
- Remediation decisions, accountable owners and completion dates
- Re-scan or other verification of corrected findings
- Privacy-safe storage and access controls for scan outputs
What good looks like
- Coverage is measured against an independent inventory
- Sensitive source contents are not copied into the evidence register
- False positives and missed detections are reviewed
- Findings lead to corrections with verified closure
- New repositories are automatically enrolled where practical
Not good enough
- Treating a policy document as proof of scanning
- Recording raw personal information in discovery findings
- Scanning only a sample of storage services with no coverage statement
- Closing findings without verification
- Review:
- Review discovery coverage and findings on a risk-based recurring cadence and after significant data flow changes.
- Expected by:
- SEC07-BP01, SEC07-BP03
EVD-SEC-022Core
Demonstrate the right people and external resources can be reached rapidly during an incident.
Must contain
- Response roles, named owner and alternate
- Preferred and independent backup contact methods
- Coverage windows, on-call rotation and escalation thresholds
- External vendors, legal and regulatory contacts
- Last reachability check, update owner and review date
What good looks like
- Scope and accountable ownership are explicit
- A current version and review history are retained
- Evidence includes tests or real incident activity
- Exceptions and follow-up actions have owners and closure evidence
Not good enough
- Contacts are not tested
- Only employee email addresses are available during an identity outage
- External partners are omitted
- Review:
- After a material incident, organisational change or exercise, and on a defined risk-based cadence.
- Expected by:
- SEC10-BP01, SEC10-BP02
EVD-SEC-023Core
Establish and evidence governed handling of a material security incident from declaration through recovery.
Must contain
- Incident severity and activation criteria
- Incident roles, responsibility and decision authority
- Notification obligations, stakeholder and out-of-band communications
- Detection, investigation, containment, eradication and recovery stages
- Evidence preservation, recovery criteria and closure
- Review, approval, version and last exercise
What good looks like
- Scope and accountable ownership are explicit
- A current version and review history are retained
- Evidence includes tests or real incident activity
- Exceptions and follow-up actions have owners and closure evidence
Not good enough
- No decision authority documented
- Plan overlooks suppliers and workload owners
- Communications assume compromised corporate tooling works
- Review:
- After a material incident, organisational change or exercise, and on a defined risk-based cadence.
- Expected by:
- SEC10-BP01, SEC10-BP02, SEC10-BP04, SEC10-BP05
EVD-SEC-024Core
Demonstrate that responders can preserve and analyse trustworthy evidence without destroying the scene or violating data handling duties.
Must contain
- Forensic accounts and region/data residency boundaries
- Evidence and log sources and retention requirements
- Snapshot, memory and disk acquisition procedures
- Hashing, chain of custody and evidence access restrictions
- Isolated analysis environment and tool validation
- Forensic collection exercise and result
What good looks like
- Scope and accountable ownership are explicit
- A current version and review history are retained
- Evidence includes tests or real incident activity
- Exceptions and follow-up actions have owners and closure evidence
Not good enough
- No chain of custody
- Responders use compromised production machines for analysis
- Evidence collection destroys source state
- Review:
- After a material incident, organisational change or exercise, and on a defined risk-based cadence.
- Expected by:
- SEC10-BP03, SEC10-BP06
EVD-SEC-025Core
Show that anticipated incidents have repeatable response procedures and that simulations produce tested improvements.
Must contain
- Scenario, triggers and detection signals
- Role assignments, required access and tooling
- Investigation, containment, eradication and recovery procedure
- Expected verification and escalation decisions
- Exercise type, scenario, participants and observed outcomes
- Improvement action owner, priority, due date and closure proof
What good looks like
- Scope and accountable ownership are explicit
- A current version and review history are retained
- Evidence includes tests or real incident activity
- Exceptions and follow-up actions have owners and closure evidence
Not good enough
- A generic response checklist substitutes for scenarios
- Simulations generate no tracked actions
- Playbooks are untested or unavailable during an outage
- Review:
- After a material incident, organisational change or exercise, and on a defined risk-based cadence.
- Expected by:
- SEC10-BP04
EVD-SEC-026Core
Demonstrate role-appropriate security skills, not merely access to a training library.
Must contain
- Role and team training needs
- Required curriculum and self-service materials
- Attendance, completion and practical competency
- Refresh cadence and training gaps
- Builder feedback and improvement actions
What good looks like
- Coverage and ownership are explicit
- Outcomes are dated and linked to actual teams or systems
- High-risk exceptions have documented approval
- Findings are tracked to verified closure
- Results lead to improvements in delivery controls
Not good enough
- A policy alone is treated as proof of operational implementation
- Findings are collected but not remediated
- Review or testing scope is unrecorded
- Evidence and approvals cannot be traced to a release or owner
- Review:
- Review following material application or process changes and on a documented risk-based cadence.
- Expected by:
- SEC11-BP01, SEC11-BP08
EVD-SEC-027Core
Demonstrate that security tests run consistently, detect relevant weaknesses and block or track releases on policy.
Must contain
- Applications, environments and test coverage
- Security test suites and trigger points
- Pipeline failure thresholds and bypass approvals
- Findings, severity, owner and remediation status
- Verification and regression results
- Coverage gaps and false-positive review
What good looks like
- Coverage and ownership are explicit
- Outcomes are dated and linked to actual teams or systems
- High-risk exceptions have documented approval
- Findings are tracked to verified closure
- Results lead to improvements in delivery controls
Not good enough
- A policy alone is treated as proof of operational implementation
- Findings are collected but not remediated
- Review or testing scope is unrecorded
- Evidence and approvals cannot be traced to a release or owner
- Review:
- Review following material application or process changes and on a documented risk-based cadence.
- Expected by:
- SEC11-BP02, SEC11-BP03, SEC11-BP04
EVD-SEC-028Core
Demonstrate adversarial validation beyond automated scanning and code reviews, with proven treatment of material findings.
Must contain
- Scope, authorisation and rules of engagement
- Threat-model-driven abuse cases and dependencies
- Execution dates, methods and excluded assets
- Findings, exploitability, business impact and reproduction summary
- Owner, treatment plan and verification or retest
- Feedback into automated tests and training
What good looks like
- Coverage and ownership are explicit
- Outcomes are dated and linked to actual teams or systems
- High-risk exceptions have documented approval
- Findings are tracked to verified closure
- Results lead to improvements in delivery controls
Not good enough
- A policy alone is treated as proof of operational implementation
- Findings are collected but not remediated
- Review or testing scope is unrecorded
- Evidence and approvals cannot be traced to a release or owner
- Review:
- Review following material application or process changes and on a documented risk-based cadence.
- Expected by:
- SEC11-BP02, SEC11-BP03
EVD-SEC-029Core
Show source changes receive meaningful, independent, traceable security review with decisions.
Must contain
- Change and repository identification
- Reviewer independence and required expertise
- Risk-sensitive code areas and review criteria
- Security review findings and discussion
- Decision, exception approval and verification
- Links to tests and merged changes
What good looks like
- Coverage and ownership are explicit
- Outcomes are dated and linked to actual teams or systems
- High-risk exceptions have documented approval
- Findings are tracked to verified closure
- Results lead to improvements in delivery controls
Not good enough
- A policy alone is treated as proof of operational implementation
- Findings are collected but not remediated
- Review or testing scope is unrecorded
- Evidence and approvals cannot be traced to a release or owner
- Review:
- Review following material application or process changes and on a documented risk-based cadence.
- Expected by:
- SEC11-BP04
EVD-SEC-030Core
Demonstrate controlled intake and traceability of third-party packages used in software builds.
Must contain
- Approved upstream package sources and registry controls
- Dependency name, version, owner and consuming services
- Integrity, signing, origin and vulnerability checks
- New package request and exception workflow
- Exposure assessment and upgrade/removal outcomes
- Access and protection of internal package repositories
What good looks like
- Coverage and ownership are explicit
- Outcomes are dated and linked to actual teams or systems
- High-risk exceptions have documented approval
- Findings are tracked to verified closure
- Results lead to improvements in delivery controls
Not good enough
- A policy alone is treated as proof of operational implementation
- Findings are collected but not remediated
- Review or testing scope is unrecorded
- Evidence and approvals cannot be traced to a release or owner
- Review:
- Review following material application or process changes and on a documented risk-based cadence.
- Expected by:
- SEC11-BP05
EVD-SEC-031Core
Demonstrate that the systems deploying code cannot bypass security controls or silently replace validated artifacts.
Must contain
- Pipeline assets, owners and trust boundaries
- Builder versus pipeline permissions and temporary credentials
- Protected security tests and branch approvals
- Build input validation and artifact provenance
- Environment-targeting and release authorization controls
- Audit logs, findings, exceptions and re-assessment dates
What good looks like
- Coverage and ownership are explicit
- Outcomes are dated and linked to actual teams or systems
- High-risk exceptions have documented approval
- Findings are tracked to verified closure
- Results lead to improvements in delivery controls
Not good enough
- A policy alone is treated as proof of operational implementation
- Findings are collected but not remediated
- Review or testing scope is unrecorded
- Evidence and approvals cannot be traced to a release or owner
- Review:
- Review following material application or process changes and on a documented risk-based cadence.
- Expected by:
- SEC11-BP06, SEC11-BP07
EVD-SEC-032Core
Show security decisions occur early inside teams with appropriate independent challenge and support.
Must contain
- Team-level security accountability and sponsorship
- Security champion or embedded specialist roles
- Training, onboarding and community support
- Threat model and design review escalation routes
- Decision evidence and independent security validation
- Participation, review latency, findings and feedback measures
What good looks like
- Coverage and ownership are explicit
- Outcomes are dated and linked to actual teams or systems
- High-risk exceptions have documented approval
- Findings are tracked to verified closure
- Results lead to improvements in delivery controls
Not good enough
- A policy alone is treated as proof of operational implementation
- Findings are collected but not remediated
- Review or testing scope is unrecorded
- Evidence and approvals cannot be traced to a release or owner
- Review:
- Review following material application or process changes and on a documented risk-based cadence.
- Expected by:
- SEC11-BP01, SEC11-BP08